Skip to main content

Autobahn bridge in Bavaria demolished with explosives (VIDEO)

A demolition contractor in the north of Bavaria recently used 200kg of explosives to demolish an old autobahn viaduct. Situated close to the town of Bad Kissingen and to the north of the city of Nuremberg, the 46 year old A7 viaduct had reached the end of its working life and a new structure had been built alongside in this scenic rural area. Pre-weakening work had been carried out using hydraulic breakers along with drilling the necessary blastholes, to ensure the supports and deck collapsed in a controlle
July 1, 2013 Read time: 2 mins
A demolition contractor in the north of Bavaria recently used 200kg of explosives to demolish an old autobahn viaduct. Situated close to the town of Bad Kissingen and to the north of the city of Nuremberg, the 46 year old A7 viaduct had reached the end of its working life and a new structure had been built alongside in this scenic rural area. Pre-weakening work had been carried out using hydraulic breakers along with drilling the necessary blastholes, to ensure the supports and deck collapsed in a controlled fashion. Traffic on the new viaduct was halted briefly by the police for the duration of the blast, which was carried out safely and successfully by the contractor. An enterprising local farmer had clearly allowed spectators to congregate in a field on the nearby hillside to watch the demolition, while coffee and beer were being sold to those with a thirst.

Related Content

  • Case equipment helps rebuild local communities after floods
    September 26, 2013
    The floods and burst riverbanks suffered last spring throughout Europe have highlighted once again the importance of having the right equipment at the right time. In Germany and more recently in Spain, Case equipment is said to have been indispensable during recovery work in flood-damaged areas. During June, roads, bridges, homes and forest trails in many urban areas were affected by the heavy rain that led to flooding throughout northern Spain’s entire Aran Valley (Lleida), and the overflowing of the Ga
  • Building the diamond road in Lesotho
    April 6, 2016
    A job site in the Southern African nation of Lesotho represents one of the most extreme and challenging projects to some key Italian firms of the last 10 years. The project was certainly different from the norm It involves building a road in the Lesotho Mountains, some 200km from the capital Maseru, with the work being carried out by the Cooperative of Building and Cement workers from Ravenna (CMC). CMC, which has ranked among Marini's clients for many years now, is involved in the construction of a
  • Second bascule bridge for Lowestoft
    December 10, 2020
    Total cost of the North Sea coastal project is around €160 million.
  • Trimble’s vision of a far more efficient future
    July 5, 2021
    Trimble is offering a future with more efficient, optimised construction operations for faster project delivery