Skip to main content

Autobahn bridge in Bavaria demolished with explosives (VIDEO)

A demolition contractor in the north of Bavaria recently used 200kg of explosives to demolish an old autobahn viaduct. Situated close to the town of Bad Kissingen and to the north of the city of Nuremberg, the 46 year old A7 viaduct had reached the end of its working life and a new structure had been built alongside in this scenic rural area. Pre-weakening work had been carried out using hydraulic breakers along with drilling the necessary blastholes, to ensure the supports and deck collapsed in a controlle
July 1, 2013 Read time: 2 mins
A demolition contractor in the north of Bavaria recently used 200kg of explosives to demolish an old autobahn viaduct. Situated close to the town of Bad Kissingen and to the north of the city of Nuremberg, the 46 year old A7 viaduct had reached the end of its working life and a new structure had been built alongside in this scenic rural area. Pre-weakening work had been carried out using hydraulic breakers along with drilling the necessary blastholes, to ensure the supports and deck collapsed in a controlled fashion. Traffic on the new viaduct was halted briefly by the police for the duration of the blast, which was carried out safely and successfully by the contractor. An enterprising local farmer had clearly allowed spectators to congregate in a field on the nearby hillside to watch the demolition, while coffee and beer were being sold to those with a thirst.

Related Content

  • Italian viaduct job for Conjet
    July 4, 2012
    The multi-span reinforced concrete viaduct at Torano, about 100km east of the Italian capital Rome, is a major structure on the main E80/A24/A25 Autostrada crossing central Italy. The Viadotto Fiume Salto was opened in the late 1960s, but the use of de-icing salts during winter months has since caused considerable calcium chloride damage to the structure forcing the Italian Highways Authority and the Autostrada di Parchi's owner Toto to carry out extensive repairs. The renovation estimated at around €5 mill
  • Poland's A1 motorway progressing well
    February 9, 2012
    The second major phase of a north-south motorway in Poland is well underway. It will reduce congestion and improve safety as Patrick Smith reports Before the whistle blows to herald the start of Euro 2012, Poland's main seaport Gdansk will boast new roads, a new airport and a new stadium. The historic city in the north of the country on the Baltic coast will be one of the venues for football's 14th European Championship, being co-hosted by Poland and Ukraine.
  • Aggregates production innovations delivering efficiency
    August 1, 2017
    EvoQuip, the newest division of Terex Corporation, is launching a Cobra 230 impact crusher later this year, to sit alongside the Cobra 260. The 24tonne machine will offer a production capacity of 140-150tonnes/hour in asphalt and construction recycling. The Cobra 230 is 11.3m long and 2.46m wide, or 5.15m wide with a side conveyor. It features a quick set-up time and the machine can be moved onsite without having to stop the crusher. Keestrack says that its novel H4 tracked cone crusher is light and compact
  • Micro surfacing the Brooklyn Bridge with Bergkamps’ M210 paver
    May 16, 2018
    A major job for micro surfacing took place on the Brooklyn Bridge near New York. It was the third time in Ken Messina’s career that he would provide micro surfacing for the iconic Brooklyn Bridge, built in 1883. Messina, as president of New Jersey-based Asphalt Paving Systems (APS), knew only too well the challenges that lay ahead. And there were many. There would be only a brief window of opportunity for paving, with lane closures starting at 10pm and ending at 5am. The cool, humid atmosphere would a