Skip to main content

Australia rail crossing upgrade plan

A programme of works aimed at eliminating all the rail crossings in Australia’s Victoria State is being established. The work is expected to cost US$705 million (A$1 billion). Eight level crossings will be removed in the north of Melbourne during 2019. In all, 75 level crossings in Melbourne will be removed by 2025. The aim of the plan is to improve safety, replacing the level crossings with either bridges or underpasses.
May 17, 2019 Read time: 1 min

A programme of works aimed at eliminating all the rail crossings in Australia’s Victoria State is being established. The work is expected to cost US$705 million (A$1 billion). Eight level crossings will be removed in the north of Melbourne during 2019. In all, 75 level crossings in Melbourne will be removed by 2025. The aim of the plan is to improve safety, replacing the level crossings with either bridges or underpasses.

Related Content

  • Germany plans replacement for A40 Neuenkamp Duisburg Bridge
    March 6, 2018
    Germany’s motorway authority has unveiled plans for an 802m cable stayed replacement bridge taking the A40 over the Rhine River near Duisburg. The state owned authority Deges - Deutsche Einheit Fernstraßenplanungs- und -bau - will oversee the project that includes an eight-lane expansion of the A40, all in the industrial Rhur region.
  • Lumitex lights up Melbourne's EastLink tunnels
    June 18, 2021
    The 1,066 high-pressure sodium lights have been exchanged for 1,174 Lumitex LEDs throughout the EastLink network's 1.6km twin tunnel complex in Melbourne, Australia.
  • US$5 billion for US bridges
    July 19, 2024
    More than US$5 billion is being made available to improve US bridges.
  • Scottish road upgrade being planned
    December 6, 2018
    Plans have been unveiled for a proposed road upgrade project in Scotland. These plans show the preferred route for the upgrade to the A96 between Nairn and Fochabers, towns which lie to the east of Inverness on Scotland’s North East coast. The project is being planned by Transport Scotland and will see the 45km road section being upgraded to dual carriageway status. The work will include building new crossings over the Aberdeen to Inverness rail links, as well as over the Spey, Findhorn and Lossie rivers.