Skip to main content

Australia rail crossing upgrade plan

A programme of works aimed at eliminating all the rail crossings in Australia’s Victoria State is being established. The work is expected to cost US$705 million (A$1 billion). Eight level crossings will be removed in the north of Melbourne during 2019. In all, 75 level crossings in Melbourne will be removed by 2025. The aim of the plan is to improve safety, replacing the level crossings with either bridges or underpasses.
May 17, 2019 Read time: 1 min

A programme of works aimed at eliminating all the rail crossings in Australia’s Victoria State is being established. The work is expected to cost US$705 million (A$1 billion). Eight level crossings will be removed in the north of Melbourne during 2019. In all, 75 level crossings in Melbourne will be removed by 2025. The aim of the plan is to improve safety, replacing the level crossings with either bridges or underpasses.

Related Content

  • Province halts planned Vancouver bridge to replace Massey Tunnel
    September 14, 2017
    Canada’s province of British Columbia has stopped procurement for a proposed 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. Local media said the province would pay $1.65 million to two of the three shortlisted consortia which had already submitted bids for what is officially called the George Massey Tunnel Replacement project.
  • Province halts planned Vancouver bridge to replace Massey Tunnel
    September 14, 2017
    Canada’s province of British Columbia has stopped procurement for a proposed 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. Local media said the province would pay $1.65 million to two of the three shortlisted consortia which had already submitted bids for what is officially called the George Massey Tunnel Replacement project.
  • New bridge project to be built in Argentina
    September 21, 2018
    A new bridge project is being planned in Argentina. The new link will connect Parana and Santa Fe. Rivers to be crossed between Parana and Sante Fe include the Parana River, the Colastine River and the Sante Fe River, although it is not yet clear which route will be used. The project is expected to cost from US$600-800 million. This will be included in the Argentinian Government’s 2019 budget. The tender process may commence in October 2018. The work will be carried out under the PPP model.
  • New version of world’s longest floating bridge
    August 12, 2014
    The creation of a new version of the world’s longest floating bridge in Seattle, in the US state of Washington, is among the world’s most eye-catching current bridge engineering projects. It is an impressive example of the health of the bridge replacement sector, particularly in the US, leaving it well placed for growth. Guy Woodford reports Already the world’s longest floating bridge at over 2,310m long, the Governor Albert D Rosellini-Evergreen Point Floating Bridge in Seattle in the United States is g