Skip to main content

Antaredja wins Jakarta Integrated Tunnel project contract

The estimated US$2.94 billion (IDR 24 trillion) contract for the construction of the Jakarta Integrated Tunnel (JIT) project in Indonesia has been awarded to private construction company Antaredja Mulia Jaya (Antaredja), with construction work due to start by the end of 2014.
April 29, 2014 Read time: 1 min
The estimated US$2.94 billion (IDR 24 trillion) contract for the construction of the Jakarta Integrated Tunnel (JIT) project in Indonesia has been awarded to private construction company Antaredja Mulia Jaya (Antaredja), with construction work due to start by the end of 2014.

Antaredja boss Agus Sidharta said that the JIT project will be developed together with the collaboration of investor Bouygues from France. It will consist of two tunnels which will have the twin functions of carrying traffic and flood water on separate levels, and will link Ulujami to Tanah Abang and Pasar Minggu to Manggarai.

The project will also help address the Indonesian capital’s traffic congestion and flood problem. Each tunnel will be 12km in length and 11m in diameter, and will be built five to 15m below the ground.

Basuki Tjahaja Purnama, the deputy governor of Jakarta, said that the project has been given the full approval by the city government.

Related Content

  • Moscow to invest $20 billion in massive road-building by 2015
    March 28, 2014
    A huge investment in road building will expand Moscow’s network – Eugene Gerden reports The government of Moscow plans to invest more than RUB 640 billion (US$20 billion) during the period of 2014-2015 .in a massive investment of road building in the city. This is expected to be part of Moscow city’s Master Plan, which is designed until 2025. Building of new roads is crucial for Moscow and should help the city to solve the problem of traffic jams. Despite all the efforts made by the city’s authorities in re
  • New Penang Bridge takes shape
    April 10, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b
  • New Penang Bridge takes shape
    May 9, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b
  • Questions and delays afflict some key Indonesian transport project
    March 28, 2014
    Indonesia’s transport expansion programme is seeing new projects commence, but others afflicted by questions over feasibility and delays. Questions over the economic feasibility of the proposed Sunda Strait Bridge project have been raised by the Public Works Ministry. This mega-project is intended to provide a road link between Sumatra and Java. But construction of the 30km structure could cost up to US$23 billion and might not be fully recovered, even if the investor collects toll fees under a 100-year con