Skip to main content

RMD Kwikform: the role of temporary works in the age of BIM

Formwork and shoring are no longer isolated services that stand outside the design process of infrastructure projects, as Simon Dowd* explained In recent years, the roles of suppliers have changed as client and main contractors require more visibility and data from their construction sites. Due to the requirements of BIM - building information modelling - and the adoption of digital processes, it is no longer the role of a temporary works business to simply provide formwork and shoring. Simon Dowd said
April 19, 2018 Read time: 4 mins
Formwork and shoring are no longer isolated services that stand outside the design process of infrastructure projects, as Simon Dowd* explained


In recent years, the roles of suppliers have changed as client and main contractors require more visibility and data from their construction sites. Due to the requirements of BIM - building information modelling - and the adoption of digital processes, it is no longer the role of a temporary works business to simply provide formwork and shoring.

Simon Dowd said, “At 319 RMD Kwikform, it is now our responsibility to interact with the entire supply chain to support the overall method of construction, including its design and processes.”

He continued, “We recognised some years back that the industry would move away from 2D drawings. It has been a slow trend. But as we work closer with customers, particularly on larger infrastructure projects, it’s clear that 3D drawings should now be standard practice. We quickly learned that in order to service our customers - and by extension their clients - better, we must evolve and work smarter alongside them.”

RMD Kwikform has since evolved its 3D capabilities and designed solutions to automate highly realistic rendered 3D models, using an in-house developed visualisation tool, LocusEye. These models can be viewed on a PC, iPad or mobile phone, providing customers with a realistic model of how any solution looks on site. Flexible in functionality, LocusEye allows for changes to be made instantly and for solutions to be re-examined.

The industry needs smart solutions. With the growing adoption of BIM and the mandatory use of it in major projects, our customers are now demanding IFC BIM compliant models of our temporary works solutions.

Dowd said, “In response to our customer’s needs, we’re now building, automating and converting 3D AutoCAD models into IFC BIM compliant models. Through this system, on-site clashes can be detected, plus data can be captured to better manage equipment and plan construction phasing.”

LocusEye has already been used across a number of national and international projects. These include the UK’s Mersey Gateway and University College London Hospital, Australia’s Ventilation Facility and a number of access towers in Saudi Arabia.

Dowd said, “Some of the feedback we’ve already had is around the responsiveness of the models and how easy they are to interrogate. However, more importantly we’ve seen how much a positive impact this has had in allowing main contractors to visualise the overall management, build ability and future planning of the site.”

He continued, “Any construction site needs to be flexible; it’s just the nature of the job, the site demands change. With BIM compliant models and through LocusEye, our customers see what impact said change will have on a site.” How does this change and affect planned phasing; how does it impact delivery of equipment? He explained, “As the models are already embedded into the BIM model, our customers are able to manipulate processes, change phasing, and target specific elements of any model. This puts the control back in the contractor’s hands and grants complete visibility.”

“With BIM compliant packages and the added advantage of LocusEye, customers use their own tacit knowledge to look at practicalities for delivery, erection and dismantling of kit. They can see where access and egress can be placed and how the temporary works solution accommodates for other works on site.”

He concluded, “It’s all about the better management of the site in order to ensure even safer working practices, and ultimately reduce time and costs.”

*Simon Dowd is major projects manager at RMD Kwikform.

For more information on companies in this article

Related Content

  • Major award for RMD Kwikform
    February 7, 2012
    UK-headquartered, global construction product specialist RMD Kwikform has been awarded the prestigious Queen's Award for Enterprise: International Trade 2010.
  • Machine control as a key component of digital construction
    November 22, 2017
    By means of digitalisation and modern communication technologies, building information modelling (BIM) techniques are helping to improve construction site planning, process control and operation flow on jobsites.
  • A new event is preparing the asphalt industry for tomorrow’s world
    September 11, 2018
    An inaugural event for the European bitumen industry urged attendees to look to the future - Kristina Smith reports What will tomorrow’s roads look like? Will lanes be narrower, will the road charge vehicles as they drive on them, will they collect data, will they be self-cleaning and de-polluting? All these questions and more were pondered at a two-day conference in Berlin, entitled ‘Preparing the asphalt industry for the future’. It was the first such event for Eurasphalt & Eurobitume (E&E), and set a
  • TISPOL 2017: Europe’s road safety record suffers as austerity bites hard
    December 21, 2017
    Police budgets are being slashed, staff numbers are falling and Europe’s long-term trend towards ever-fewer road deaths has ground to a halt. Does Europe’s road network face a far more dangerous future? Geoff Hadwick reports from TISPOL 2017 in Manchester, UK. Europe’s road safety record is under threat. Lower and lower funding levels have become a very serious, and very worrying, problem for the EU’s traffic police bosses. They know that they must find new ways to focus road users on changing their beha