Skip to main content

RMD Kwikform: the role of temporary works in the age of BIM

Formwork and shoring are no longer isolated services that stand outside the design process of infrastructure projects, as Simon Dowd* explained In recent years, the roles of suppliers have changed as client and main contractors require more visibility and data from their construction sites. Due to the requirements of BIM - building information modelling - and the adoption of digital processes, it is no longer the role of a temporary works business to simply provide formwork and shoring. Simon Dowd said
April 19, 2018 Read time: 4 mins
Formwork and shoring are no longer isolated services that stand outside the design process of infrastructure projects, as Simon Dowd* explained


In recent years, the roles of suppliers have changed as client and main contractors require more visibility and data from their construction sites. Due to the requirements of BIM - building information modelling - and the adoption of digital processes, it is no longer the role of a temporary works business to simply provide formwork and shoring.

Simon Dowd said, “At 319 RMD Kwikform, it is now our responsibility to interact with the entire supply chain to support the overall method of construction, including its design and processes.”

He continued, “We recognised some years back that the industry would move away from 2D drawings. It has been a slow trend. But as we work closer with customers, particularly on larger infrastructure projects, it’s clear that 3D drawings should now be standard practice. We quickly learned that in order to service our customers - and by extension their clients - better, we must evolve and work smarter alongside them.”

RMD Kwikform has since evolved its 3D capabilities and designed solutions to automate highly realistic rendered 3D models, using an in-house developed visualisation tool, LocusEye. These models can be viewed on a PC, iPad or mobile phone, providing customers with a realistic model of how any solution looks on site. Flexible in functionality, LocusEye allows for changes to be made instantly and for solutions to be re-examined.

The industry needs smart solutions. With the growing adoption of BIM and the mandatory use of it in major projects, our customers are now demanding IFC BIM compliant models of our temporary works solutions.

Dowd said, “In response to our customer’s needs, we’re now building, automating and converting 3D AutoCAD models into IFC BIM compliant models. Through this system, on-site clashes can be detected, plus data can be captured to better manage equipment and plan construction phasing.”

LocusEye has already been used across a number of national and international projects. These include the UK’s Mersey Gateway and University College London Hospital, Australia’s Ventilation Facility and a number of access towers in Saudi Arabia.

Dowd said, “Some of the feedback we’ve already had is around the responsiveness of the models and how easy they are to interrogate. However, more importantly we’ve seen how much a positive impact this has had in allowing main contractors to visualise the overall management, build ability and future planning of the site.”

He continued, “Any construction site needs to be flexible; it’s just the nature of the job, the site demands change. With BIM compliant models and through LocusEye, our customers see what impact said change will have on a site.” How does this change and affect planned phasing; how does it impact delivery of equipment? He explained, “As the models are already embedded into the BIM model, our customers are able to manipulate processes, change phasing, and target specific elements of any model. This puts the control back in the contractor’s hands and grants complete visibility.”

“With BIM compliant packages and the added advantage of LocusEye, customers use their own tacit knowledge to look at practicalities for delivery, erection and dismantling of kit. They can see where access and egress can be placed and how the temporary works solution accommodates for other works on site.”

He concluded, “It’s all about the better management of the site in order to ensure even safer working practices, and ultimately reduce time and costs.”

*Simon Dowd is major projects manager at RMD Kwikform.

For more information on companies in this article

Related Content

  • A breakthrough in the horizontal reuse of PA (porous asphalt)
    May 12, 2016
    An ambitious objective has led to significant steps in the reuse of PA (porous asphalt). While the market incidentally produces PA with a maximum of 30% of recovered raw materials, BAM has introduced its own innovations, enabling more than 90% of raw materials to be reused. And this year, subsidies from the European Commission will enable the LE2AP demonstration project to be constructed: one kilometre of sustainable PA. Large-scale production is also being developed.
  • Swarco launches CubiLED – the modular VMS
    January 6, 2022
    Swarco's new variable message sign solution offers flexibility for highway agencies
  • Infrastructure stays strong on the road to recovery
    July 1, 2021
    After more than a year of uncertainty, the road industry is coming back stronger than ever before thanks to new ways of working and increased investment – because building new infrastructure lays the foundation for a more resilient and economically robust world.
  • Australia’s road safety problems are a cause for concern
    January 23, 2019
    The Australian Road Research Board (ARRB) has highlighted key problems with road safety. According to the ARRB, these issues must be addressed if Australia’s road casualty rate is to be reduced. Road death tolls are being reduced as he latest results show, but more work needs to be done. According to the ARRB, the road death tolls in Victoria dropped 20% for 2018 when compared with the previous year. This is a major improvement, showing the gains made by Victoria’s road agency VicRoads and the state’s Tr