Skip to main content

Aggregate Industries lightens the load for the Acton Swing Bridge

Aggregates Industries recently lightened the load for the 73m-long bow string truss Acton Swing Bridge in England. When opened in 1933, it was the first floating swing bridge in the UK – floating on a pontoon. The 84-year-old bridge, which is cared for by the Canal & River Trust charity, carries the busy A49 road over the River Weaver Navigation, in the county of Cheshire. A recent €1.7 million complete refurbishment included strengthening works to the underside of the bridge as well as improvements to its
October 2, 2018 Read time: 3 mins
Work in full swing on the Acton Swing Bridge
Aggregates Industries recently lightened the load for the 73m-long bow string truss Acton Swing Bridge in England. When opened in 1933, it was the first floating swing bridge in the UK – floating on a pontoon.


The 84-year-old bridge, which is cared for by the Canal & River Trust charity, carries the busy A49 road over the River Weaver Navigation, in the county of Cheshire. A recent €1.7 million complete refurbishment included strengthening works to the underside of the bridge as well as improvements to its appearance.

Core to the project’s success was the ability to enhance the bridge’s structural integrity to allow for heavier traffic. The challenge was to do this without an increase of mass – given the required 2.5m allowance for boats passing underneath.

As such, 2297 Aggregate Industries’ Lytag secondary aggregate - up to 50% lighter than normal weight aggregate - was chosen by lead contractor Kier Construction. By using Lytag to replace the infill with the framework, the weight was effectively reduced from 2,400kg/m³ to 1,650kg/m³. This gave increased flexibility and durability for Kier, while ensuring an increased overall strength. The approach also negated the need for quarried aggregate, helping to reduce material requirements and ensure efficiencies.

With works now complete, the contract saw Aggregate Industries supply 100tonnes of 0/14mm Lytag - a tailored blend of aggregates specifically designed to offer a greater reduction in concrete density.

The design freedom afforded by Lytag offers the same level of structural performance as normal weight concrete, explained Steve Curley, general manager for Lytag at Aggregate Industries.


“However, it is significantly lighter, thus reducing the dead load of a construction. In projects such as Acton Swing Bridge, where strengthening works need to be achieved without resulting in an increase to size or mass, this product can really make the otherwise infeasible achievable.”

The lightweight concrete has a density of 1,850kg/m³ using natural fines (normal weight concrete of 2,400 kg/m³). If fines are used in conjunction with the 4/14mm aggregate, the density can be as low as 1,650kg/m³.

Using Lytag within the design can not only reduce the thickness of the slab, columns and foundations but reduce the amount of rebar required, resulting in a quicker more cost-effective greener structure.

Aggregate Industries is a member of the Swiss global building materials provider LafargeHolcim Group.

For more information on companies in this article

Related Content

  • US RCC paving job carried out with Volvo CE machines
    October 21, 2016
    US contractor Conewago Enterprises is using a paver from Volvo CE to lay a roller-compacted concrete (RCC) surface at the Liberty Trust distribution centre in Shippensburg, Pennsylvania. This facility lies close to Interstate-81, which runs through the Appalachian Mountains from the Canada-US border to Tennessee. This 1,376km route carries heavy truck traffic and as a result, hundreds of distribution warehouses have being constructed along the route of this busy transport corridor. Conewago Enterpris
  • SSL settles legal issues, Champlain Bridge to open December 21
    April 18, 2018
    Montreal will get its new Champlain Bridge just before Christmas, a date agreed upon by the Canadian government and the SNC-Lavalin-led consortium. The agreement settles an outstanding lawsuit that the Consortium had filed regarding costs increases of around US$186.5 million relating to the transportation of oversized parts and delays to the bridge's construction, according to media reports. Last month SNC-Lavalin, head of the Signature on the Saint-Laurent Group (SSL), had said that the bridge over the
  • Zoomlion’s world record boom pump
    January 6, 2017
    Zoomlion has unveiled its innovative new truck-mounted concrete pump, which features a 101m boom. This innovative 101m unit is now a world record holder as the longest truck-mounted concrete boom pump. The machine was launched on the 20th anniversary of Zoomlion and is one of a new generation of products developed by Zoomlion and its Italian CIFA operation. The new machine has been developed from the existing 80m truck-mounted pumps, with its innovative lightweight composite boom being a key feature of the
  • Zoomlion’s world record boom pump
    November 20, 2012
    Zoomlion has unveiled its innovative new truck-mounted concrete pump, which features a 101m boom. This innovative 101m unit is now a world record holder as the longest truck-mounted concrete boom pump. The machine was launched on the 20th anniversary of Zoomlion and is one of a new generation of products developed by Zoomlion and its Italian CIFA operation. The new machine has been developed from the existing 80m truck-mounted pumps, with its innovative lightweight composite boom being a key feature of the