Skip to main content

New turning simulation programme from Savoy

Savoy Computing has released a new version of its turning simulation program Autotrack 11, which extends and updates its support for a wide variety of base platforms as well as introducing new features. The software now supports the latest AutoCAD 2014, AutoCAD Civil 3D 2014 and other AutoCAD 2014 verticals and also will run in Bentley programs such as InRoads, MX and Power Civil. Updates for Bentley include support for full 3-axis vehicle rock and roll on 3D surface terrains, vertical headroom clearance an
August 22, 2013 Read time: 2 mins
RSS2902 Savoy Computing has released a new version of its turning simulation program Autotrack 11, which extends and updates its support for a wide variety of base platforms as well as introducing new features. The software now supports the latest 3282 AutoCAD 2014, AutoCAD Civil 3D 2014 and other AutoCAD 2014 verticals and also will run in Bentley programs such as InRoads, MX and Power Civil. Updates for 4019 Bentley Systems include support for full 3-axis vehicle rock and roll on 3D surface terrains, vertical headroom clearance and 3D grounding analysis in the latest v8i SS3 civil engineering releases running with Bentley OpenRoads technology.

The up and coming 2614 Bricsys system is also now catered for on both the 32-bit version and the new 64-bit BricsCAD 13.2. Savoy can provide BricsCAD bundled with AutoTrack.

New features in the program modules include improvements made to the body outline import facility in AutoTrack Roads Pro allowing scale and offset to be specified. New design libraries include India, Australia and updated Swedish design vehicles, and specific design vehicles for the US states of Wisconsin, Indiana & Tennessee. In AutoTrack Parking rows can now be created on curved alignments.

For more information on companies in this article

Related Content

  • Straight to the point for measurement
    February 6, 2018
    Leica Geosystems says it is introducing a major advance in site surveying. This offers a novel tilt compensation system, so that users are no longer required to hold the pole vertical. The new Leica GS18 T is claimed to be the world’s fastest GNSS RTK rover, while the firm is also offering the latest versions of Leica Captivate field software and Leica Infinity office software. With the addition of calibration-free GNSS and various upgrades to the Captivate field software and Infinity office software, use
  • Efficient drainage solutions from AWMS
    April 5, 2017
    Alumasc Water Management Solutions (AWMS) is offering innovative drainage solutions from its leading civil drainage brand Gatic, ideal for highways applications. The Slotdrain is a novel, high capacity surface water drain. Its Filcoten is an advanced, lightweight concrete channel system that offers strength, high performance and environmental compatibility Meanwhile the firm claims that its EnviroKerb product is the lightest, strongest and greenest range of kerb drainage solutions.
  • New tests, new technology, new users: why materials testing is a growing market
    February 7, 2017
    A look back at some of the developments this year, and a look ahead to what may come next reveals the increasing use of materials testing. New technology and new ways to process and analyse data will drive change even further - Kristina Smith reports For materials testing equipment manufacturers, constant change is business as usual. New tests emerge, new standards are written and new practices spread around regions and the world. There are also new materials to deal with: bitumen modified with polymers
  • Far from formulaic
    January 6, 2017
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on