Skip to main content

Affordable excavator GPS grade control

Hemisphere GPS says that its new Earthworks excavator grade control system suits use with small to medium-sized contractors. The package is said to be simple and affordable and displays bucket position relative to desired grade, improving accuracy and efficiency when digging foundations, trenching, cutting a slope and in many other excavation applications.
April 4, 2012 Read time: 2 mins
2895 Hemisphere GPS says that its new Earthworks excavator grade control system suits use with small to medium-sized contractors. The package is said to be simple and affordable and displays bucket position relative to desired grade, improving accuracy and efficiency when digging foundations, trenching, cutting a slope and in many other excavation applications.

Called Earthworks X100, the system includes three rugged angle sensors and a touchscreen terminal that displays the bucket teeth or tool position to within 20mm. The system can be upgraded to either Earthworks X200 or X300, the full 2D and 3D excavator grade control systems capable of shaping dual-slopes and more complex design surfaces. Using Earthworks X100, the operator sets the desired grade line in the terminal, references the bucket or tool and then digs or fills to grade based on the visual feedback from the terminal. Bucket or tool position relative to grade is displayed graphically along with a numerical cut/fill readout.

Improvements to productivity and accuracy are immediate as manual grade checking is no longer necessary. The operator can remain safe and comfortable in the cab making the best use of the operating hours. The company also plans to expand its Earthworks product portfolio by offering complementary blade solutions.

For more information on companies in this article

Related Content

  • Leica Geosystems launches iCON for wheeled loaders
    April 19, 2013
    Leica Geosystems has unveiled its new powerful Leica iCON 3D machine control system for wheeled loaders. The Swiss firm says the system allows users to complete their earthworks jobs faster and correctly the first time. It is also said to precisely control material cut and fill, saving a lot of time and money by reducing rework and over-excavation, while also making grading operations with wheeled loaders more efficient. Grade checking, says Leica, can be eliminated, further enhancing productivity, efficien
  • Asphalt and bitumen - testing for performance
    February 29, 2012
    The stresses placed on modern asphalt and bitumen means that specialist equipment is essential to make sure performance specifications are met. As road traffic increases at a rapid pace and road safety becomes a priority issue, asphalt is put under increasingly higher stresses. For example, road surfaces are subject to compression, flexural tensions and tangential stresses: internal friction, depending on the aggregates, and the cohesion, guaranteed by bitumen's composition, are the two main properties whic
  • Trimble announces key technology developments
    November 7, 2018
    Trimble is expanding its range of machine control technology options for users of graders and excavators with the release of key new releases. One is for the LOADRITE Payload Management system, which can now be utilised on excavators already equipped with the Trimble Earthworks Grade Control Platform. The other systems are new versions of the Trimble Earthworks Grade Control Platform that can be used with graders or deliver automatic guidance for tiltrotators. These are key developments for the firm, boo
  • Machine control developments from Leica Geosystems, Topcon, Trimble and Wirtgen in the slipforming sector
    July 1, 2013
    Machine control technologies were pioneered in the concrete paving sector with systems having been used for over 10 years. Leica Geosystems was the first of the machine control technology suppliers to offer these systems on concrete slipforming machines and has developed a strong position in this segment. However the company met resistance from some quarters in the construction market and specialist Karl Soar said that some contractors were very reluctant to give up using conventional stringlines. He said,