Skip to main content

Accurate instruments

Rugged and durable, the new Rugby 260SG, 270SG and 280DG lasers from Leica Geosystems are said to suit a wide range of construction duties. These multipurpose horizontal/vertical grade lasers can be used for flat and grade applications and are equipped with a large LCD display and a five button key pad.
February 28, 2012 Read time: 1 min
The new construction lasers from Leica Geosystems are rugged, durable and accurate
Rugged and durable, the new Rugby 260SG, 270SG and 280DG lasers from 265 Leica Geosystems are said to suit a wide range of construction duties. These multipurpose horizontal/vertical grade lasers can be used for flat and grade applications and are equipped with a large LCD display and a five button key pad.

Leica Rugby 260SG is a single grade laser for general construction with a rugged casing, full LCD display, a highly visible red beam laser, a semi-automatic levelling mode and a working range of up to 600m. The more sophisticated Leica Rugby 270SG is based on the same platform as the Rugby 260SG but also offers full automatic levelling and an extended working range of up to 700m. The Leica Rugby 280DG is a multipurpose laser with full automatic, dual-grade capabilities. Features include a red bright beam, a plumb beam, scan mode, horizontal and vertical self-levelling, a dual grade up to 15% and is available with a two-way remote control.

For more information on companies in this article

Related Content

  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w
  • High reach excavator safety training launched
    April 11, 2012
    New demolition tolls are coming to market while safety training for high reach excavator operators has been establishe.d With the Intermat equipment exhibition due shortly, various manufacturers are offering new demolition tools to the market. Meanwhile the UK's National Federation of Demolition Contractors (NFDC) is now setting a lead in the sector by offering a high reach excavator training course. The NFDC has partnered with the National Demolition Training Group (NDTG) to develop the world's first train
  • High reach excavator safety training launched
    April 13, 2012
    New demolition tolls are coming to market while safety training for high reach excavator operators has been established With the Intermat equipment exhibition due shortly, various manufacturers are offering new demolition tools to the market. Meanwhile the UK's National Federation of Demolition Contractors (NFDC) is now setting a lead in the sector by offering a high reach excavator training course. The NFDC has partnered with the National Demolition Training Group (NDTG) to develop the world's first train
  • Sandvik on drill at the Liantang/Heung Yuen Wai Boundary project
    April 4, 2018
    The Liantang/Heung Yuen Wai Boundary Control Point project is creating a seventh land crossing, including highways and tunnels, between Shenzhen in China and Hong Kong There are already two control points on the eastern side of the New Territories between China and Hong Kong - at Man Kam To and Sha Tau Kok – to access eastern Shenzhen and Guangdong. All cross-boundary traffic travelling from these points must use busy local roads in Hong Kong and Shenzhen before joining the major highway systems. The US