Skip to main content

Accurate delivery vehicle schedules with Trimble

The new FieldMaster Logs application from Trimble will assist construction firms running on-highway trucks in better scheduling of their fleets. This package has now been registered with the US Federal Motor Carrier Safety Administration (FMCSA) as a self-certified Electronic Logging Device (ELD) solution.
January 26, 2018 Read time: 1 min
Efficient management of on-highway fleets can be achieved using the latest Trimble package
The new FieldMaster Logs application from 2122 Trimble will assist construction firms running on-highway trucks in better scheduling of their fleets. This package has now been registered with the US 4170 Federal Motor Carrier Safety Administration (FMCSA) as a self-certified Electronic Logging Device (ELD) solution.


The package offers hours of service (HOS) and driver vehicle inspection report (DVIR) tools as part of its fleet management portfolio. The package logs and tracks driver activity and advises the driver about hours remaining. The system also reports to managers to measure driver activity and availability. Using FieldMaster Log’s DVIR features ensure that drivers perform safety inspections of their vehicle and that vehicle issues are captured and communicated to the maintenance team.  

Trimble’s Fleet Management portfolio offers reliable hardware and software solutions for capturing vehicle positions, tracking driver behavior and communicating with the vehicle’s engine to obtain diagnostics.

For more information on companies in this article

Related Content

  • Multiple roles for compact construction machines
    February 24, 2012
    Versatility remains the key for the utility equipment sector. The range of duties that compact machines can be used for continues to grow.
  • A virtual virtuous circle
    March 19, 2021
    Virtual sensors will allow a safer driving experience and reduce road maintenance costs. Tactile Mobility’s Eitan Grosbard talks to David Arminas
  • Precision narrows the gap between design software and GIS
    March 20, 2012
    Greater precision is helping blur the boundaries between GIS technology and design software While GIS map based technology has extended its range across an ever more universal spectrum of uses in the highways sector, it is increasingly showing weaknesses for engineering purposes. It is very often not accurate enough. This has not mattered previously because the GIS tool has been seen essentially as an automated version of paper based systems from the design department's point of view. Where engineers
  • Concrete plant efficiency with new machines
    August 14, 2019
    New technology for concrete production will help boost efficiency New advances in concrete plant technology will help boost materials quality for users. The latest machines are more versatile and more productive than previous generation equipment. Ease of transport and fast assembly/disassembly and commissioning are other important factors for the latest plants. Research and development is an important issue for all manufacturers in the segment. With Liebherr for example having two new laboratory mixe