Skip to main content

Accurate delivery vehicle schedules with Trimble

The new FieldMaster Logs application from Trimble will assist construction firms running on-highway trucks in better scheduling of their fleets. This package has now been registered with the US Federal Motor Carrier Safety Administration (FMCSA) as a self-certified Electronic Logging Device (ELD) solution.
January 26, 2018 Read time: 1 min
Efficient management of on-highway fleets can be achieved using the latest Trimble package
The new FieldMaster Logs application from 2122 Trimble will assist construction firms running on-highway trucks in better scheduling of their fleets. This package has now been registered with the US 4170 Federal Motor Carrier Safety Administration (FMCSA) as a self-certified Electronic Logging Device (ELD) solution.


The package offers hours of service (HOS) and driver vehicle inspection report (DVIR) tools as part of its fleet management portfolio. The package logs and tracks driver activity and advises the driver about hours remaining. The system also reports to managers to measure driver activity and availability. Using FieldMaster Log’s DVIR features ensure that drivers perform safety inspections of their vehicle and that vehicle issues are captured and communicated to the maintenance team.  

Trimble’s Fleet Management portfolio offers reliable hardware and software solutions for capturing vehicle positions, tracking driver behavior and communicating with the vehicle’s engine to obtain diagnostics.

For more information on companies in this article

Related Content

  • Tunnel construction benefits from improved visibility
    November 14, 2012
    Major new tunnel construction projects will, on completion, help secure more reliable journey times for hundreds of thousands of people across the world. Meanwhile, as Guy Woodford reports, leading ITS solution companies have been providing vital equipment for major road tunnels The Martina Tunnel Boring Machine (TBM), a 4,500tonne Herrenknecht Earth Pressure Balance Shield said to have a world record diameter of 15.55m, has required just under a year to build the first of two tunnel tubes for the 2.5km lon
  • Trimble partnering with software firm HCSS
    December 11, 2018
    Trimble and HCSS are partnering to couple estimating and bidding workflows to field operations. The firms say this collaboration will include product integrations to Trimble's construction software portfolio, helping boost productivity and quality for construction. The companies plan to develop solutions to improve current workflow and real-time visibility for customers by connecting bidding and estimating processes to developments onsite. Trimble and HCSS are currently exploring how best to bring HCSS's
  • Liebherr’s R 946 is firm’s first Stage IV crawler excavator
    January 6, 2017
    Liebherr’s new R 946 model is its first crawler excavator to meet the stage IV/ Tier 4f emissions standards. The new R 946 has an operating weight of around 40tonnes. The crawler excavator’s new six-cylinder Liebherr engine delivers 200 kW and integrates a new stage IV/ Tier 4f exhaust gas treatment system. This features a selective catalytic reduction (SCR) system using urea injection to post-treat exhaust gases.
  • Liebherr’s R 946 is firm’s first Stage IV crawler excavator
    February 19, 2015
    Liebherr’s new R 946 model is its first crawler excavator to meet the stage IV/ Tier 4f emissions standards. The new R 946 has an operating weight of around 40tonnes. The crawler excavator’s new six-cylinder Liebherr engine delivers 200 kW and integrates a new stage IV/ Tier 4f exhaust gas treatment system. This features a selective catalytic reduction (SCR) system using urea injection to post-treat exhaust gases.