Skip to main content

All change – the evolution of data

Bentley Systems believes that it is on the cusp of a revolutionary step in computing that will boost the working efficiency of companies right across industry. Bhupinder Singh, chief products officer at Bentley Systems explained that its key advance will allow firms to utilise what they already have, but more efficiently.
October 13, 2017 Read time: 4 mins

Embracing change; handling data as an evolutionary process, Mike Woof writes

4019 Bentley Systems believes that it is on the cusp of a revolutionary step in computing that will boost the working efficiency of companies right across industry. Bhupinder Singh, chief products officer at Bentley Systems explained that its key advance will allow firms to utilise what they already have, but more efficiently. He said, “Companies are effectively analysing just 1% of their data. The rest is ‘dark data’ that is stored but not used.”

However, the new iModel 2.0 cloud platform and its first new service, iModelHub, now being introduced by Bentley could deliver a quantum leap. This offers users of the ProjectWise design integration services package the option to speed up the process of going digital.

The existing ProjectWise Design Integration service from Bentley Systems has proven highly successful. This package manages file-based workflows for project delivery and is able to cope with the often disconnected nature of infrastructure project work packaging and collaboration. By adding the new iModelHub package Bentley is benefiting from its partnership with 2794 Microsoft for the Azure cloud services system. The firm claims that this can deliver a connected project that synchronises project changes, and automatically updates a composite project iModel. The system is said to allow for comprehensive and continuous design reviews, highlighting progress and risks in digital workflows.

The iModelHub package tracks project changes on a timeline, and notifies project participants, based on their ProjectWise workflow configuration, about the availability of relevant changes. Users can choose to synchronise from particular timeline milestones, allowing them to understand the impact of ongoing changes.

Keith Bentley, chief technology officer at Bentley Systems provided some context to this launch. He said that in the early 1980s as a student he listened to a presentation on the coming importance of personal computers by one Bill Gates, which influenced him strongly and led to the founding of Bentley Systems. “It was a once in a lifetime experience,” he said, adding that this latest advance will be just as significant. “Not everyone is lucky enough to have two once in a lifetime experiences,” he joked.

Bentley said that the firm has made major progress and explained, “Back in 2009 we introduced iModels.” This delivered a step change and he continued, “It began to be used outside of design.”

Bentley explained that the original iModel 1.0 was basically a container for information. It could be used to store images, 2D and 3D files and a range of other information. However he explained that the iModel 2.0 is also a relational database and said that is advance is about ‘embracing change’.

“Most people think of the cloud as a large supercomputer with almost infinite power.”

Although iModels are now widely used in industry, Bentley said that the way these are utilised leave much to be desired, “The problem is their data is stored by a programmer who has only one intention.”

He continued, “We can’t leave data in this tangled mess. We need to be able to use it. Change is not an inconvenient truth we can ignore.”

The iModelHub offers an efficient solution and he said, “We need a place to store this change. It is not there to store iModels, it is there to store change.”

Rather the containing files in the conventional sense, the iModelHub is the repository of change. Bentley said, “If iModelHub stores the change, where is the master copy? My master copy is the timeline. We have to embrace change. Let’s visualise that change and show what’s different.”

To provide the full range of analytics across multiple projects, and for connected assets, iModel agents can be programmed for each subject. Users can be notified of project-level changes by iModelHub and the system filters updates, providing accessibility of infrastructure engineering model data for compliance and safety. Capacity is less of an issue and he said, “Another important place where iModels are going to be stored is in the cloud.”

The technology is still in development but Bentley said, “We are working on going live with its iModelBridges solution at the beginning of next year.”

He added, “I think it’s the most exciting thing we have ever done.”

For more information on companies in this article

Related Content

  • Moba senses the future with PAVE-TM
    February 25, 2019
    Moba has revised and improved the sensor technology on the company’s PAVE-TM paving thickness measuring system. The technology has meant that PAVE-TM system - for non-contact layer thickness measurement - is now competing in the finals against two other innovations in the bauma Innovation Awards category “Components, Digital Systems”. Moba says that PAVE-TM is the world‘s only system for automatic layer thickness measurement in road construction. The system constantly displays the thickness of the pa
  • Connected construction paves the way for next gen highways
    December 13, 2024
    Luc Le Maire, senior vice president EMEA at Topcon Positioning Systems explains how utilising connected construction technology will help to deliver the next gen, smart highways
  • Latest innovations in GPS and machine control
    February 22, 2012
    Modern satellite technology is making life easier for everyone on the construction site and in the office. Most major equipment manufacturers are now integrating GPS machine control systems into the design of excavators, bulldozers, pavers, and motor graders. For stake-less work it is a major component for automatic grading, surveying, and excavating systems, with contractors and construction companies using GPS machine control systems to improve operations.
  • Widening works: road user’s nightmare or operator’s challenge?
    March 14, 2017
    Early - and continuous planning - is essential for successful road widening projects. By Nina Sacagiu, project manager, and Laurent Charles-Nicolas, project director, at Egis. Keeping goods and people moving safely is the primary objective of any transport authority across the world. Delivering this objective on motorways and making the most out of network capacity requires all the resources, skills and ingenuity of those in charge of managing the infrastructure. When the network can no longer cope wit