An innovative surface treatment approach by Foster Contracting Limited has been developed for use on a £745million roads project in Aberdeen, Scotland. The specialist contractor, Foster Contracting Limited (FCL), has played a key role in a major project, to build the Aberdeen Western Peripheral Route/Balmedie-Tipperty (AWPR/B-T).
AWPR Construction Joint Venture, the contractor appointed to design and construct the project, approached FCL to provide a customised treatment to remove the latency from the sl
Far too often, managers will view training as a luxury and not as a competitive and strategic necessity. Lazy team leaders regularly argue that it is a waste of time and money training their people, not least because these same trainees might subsequently leave the organisation. Courses are seen as an interruption, and a good way to delay things. There is always something much more pressing and important on the to-do list and staff can end up feeling forced into the training department. But these are weak a
New legislation has changed fuel specifications as well as engine emission requirements, writes Claire Symes. The latest Stage IIIB engines mean that on-site maintenance routines for newer equipment need to be changed. And at the same time, new fuel specifications also mean changes to management of fuel for all machines. The European standard for gas oil, EN590, changed at the start of the year in order to comply with the Renewable Energy and Fuel Quality Directives. This means fuels now must be low sulphur