Skip to main content

VIDEO: UK overnight bridge demolition job

May 16, 2016
A spectacular video shows footage a key bridge demolition job in the UK. The bridge crossing the busy A38 near Plymouth was demolished during a weekend possession on the 14th and 15th of May 2016. The footage has been released by 8100 Highways England and shows the old Merafield Bridge at Plympton being demolished overnight on Saturday 14th May, marking the final stage of a £6.3 million maintenance project on the A38.

A new bridge was built alongside the old structure and was opened two weeks ago. The project was completed as the Government delivers a £15 billion upgrade to motorways and major A-roads.

Approximately 50kgs of explosives were used, contained within 278 drilled locations concentrated around the supporting piers and the abutments at each end. The new concrete bridge is 80m long, 11.3m wide and made of 2,503tonnes of concrete and 401tonnes of steel.

The old bridge had to be removed as it was suffering from alkali silica reaction, commonly known as 'concrete cancer'. In time, the structure would eventually become unsafe, and it needed replacing before that happened.

Parts of the old bridge were not fully broken up in the demolition, so work to break up and remove the bridge continued into the afternoon of Sunday 15th May. Throughout the project, timing of the work has been coordinated to avoid disruption during the South West’s busy holiday season.

The scheme will be fully completed by July. Remaining work will include clearing away the debris from the demolished structure, completing drainage on Merafield Road, finishing works on the new bridge and reinstating the road markings on the A38.

For more information on companies in this article

Related Content

  • Landmark new UK bridge project
    December 2, 2020
    COWI is working on a landmark UK bridge project.
  • PERI fills gap in Greek market
    February 19, 2013
    A team of Greek and German PERI engineers have developed a comprehensive formwork and scaffolding solution for the T4 bridge on the A7 motorway in Greece. The 160km long A7 connects Kalamata in the south to Corinth in the northwest of the Peloponnese peninsula. On one stretch of the motorway a 390m long arched bridge – known as T4 – is being used to close the gap between Paradisia and Tsakona. Set for completion in early 2014, two-thirds of the 22m wide bridge superstructure will be suspended on a steel arc
  • Highways England on track with smart motorway upgrade near Cheshire
    September 28, 2018
    A 20tonne gantry – the biggest single structure under a major motorway upgrade in England - has been hoisted into place in Cheshire county.
  • Sandvik’s Turkish delight at groundbreaking tunnel vision
    May 20, 2014
    Turkey’s longest, and what will be the world’s fourth longest, highway tunnel is being built under Mount Ovit in the northeast of the country. Sandvik Construction is playing a vital role in the construction of the giant new structure, which will enable all-year-round access to what is a relatively remote and often snow-blocked part of Anatolia Having had their freedom of movement blighted for many years by wintertime snow blocking the D925 highway, along with narrower roads and passes, at Mount Ovit, resi