Skip to main content

VIDEO: Kolin-Kalyon and Limak-Cengiz win North Marmara connector tenders

May 23, 2016
Turkey has awarded the much-delayed tenders for the motorway connector roads to Istanbul’s Third Bosphorus Bridge.

The 90km motorway section between Kinali and Odayeri was awarded to the Kolin-Kalyon joint-venture with completion in seven years and nine months, according to Turkish media reports. The 170km section between Kurtkoy and Akyazi was awarded to Limak-Cengiz joint-venture which will finish the work in six years and nine months.

The tenders were part of the 260km North Marmara Motorway project that includes the soon to be completed Yavus Sultan Selim Bridge. The Northern Marmara Motorway will, when completed, flow around the northern sections of Istanbul, the country’s financial centre.

The highway will cross the Bosphorus Strait over the Yavuz Sultan Selim Bridge and serve as the outermost beltway of Istanbul. The route runs from Kınalı on the European side to Akyazı on the Asian side. Importantly, the eastern end of the motorway will connect with the Otoyol 4, also known as Anadolu Otoyolu or Anatolia Motorway. The O-4 is a toll motorway connecting the northeastern Marmara Region to the Central Anatolia Region, including the capital Ankara.

The four-lane Third Bosphorus Bridge, now officially the Yavuz Sultan Selim Bridge, is a 2.2km cable-stayed and suspension crossing for rail and motor vehicles. The longest span is just over 1.4km and width is 58.4m. The bridge sits between Garipçe in Sarıyer on the European side and Poyrazköy in Beykoz on the Asian side. Work started in May 2013 and completion is expected later this year.

Related Content

  • Russia-China set up joint venture for Amur River Bridge
    March 22, 2016
    A Russian-Chinese joint venture Amur-Heilongjiang has been set up for construction of a road and rail bridge across the Amur River. The project, worth around US$275 million, will connect the Russian region of Blagoveshchensk, located at the confluence of the Amur and Zeya Rivers in the far east, and the Chinese province of Heihe. according to the Kommersant newspaper. The 2.2km bridge, expected to be open by 2020, was proposed in 2007 by Valery Solomonovich Gurevich, the vice-chairman of Russia’s Jewi
  • New road now open to traffic in Rwanda
    September 24, 2015
    A major road project in Rwanda has been completed on schedule by contractor STRABAG. The rebuilt road’s route runs 78km and connects capital Kigali with the border town of Gatuna. STRABAG won the contract to reconstruct the road in July 2011. The construction phase commences in January 2012 and took 44 months to complete. The official opening took place in the presence of Rwanda’s Minister of Infrastructure James Musoni and Neven Mimica, the European Union Commissioner for International Cooperation and Deve
  • Colombia road and tunnel connection to Medellin Airport
    September 13, 2017
    Work is well underway on a new road and tunnel project, which will provide an improved connection between the Colombian city of Medellin and its airport. The new link will measure 24km long in all and the construction work is expected to cost over US$342 million, with completion due at the end of 2018. The project is known overall as the Oriente Tunnel, with the work being carried out as a concession by Concesion Tunel Aburrá-Oriente. The project comprises four sections in all. These are the 786m Seminario
  • Philippines bridge project awarded
    December 11, 2017
    A US$403 million contract for a cable-stayed bridge in the Philippines has been awarded. The design and build deal for the 8.2km bridge will be handled by a joint venture team comprising Acciona Construccion, First Balfour and DM Consunji. The partnership is called the Cebu Link Joint Venture and should complete work on the link, which connects Cebu with Cordova, in 2021. The contract was awarded by the Cebu Cordova Link Expressway, a subsidiary of Metro Pacific Tollways. Included in the contract is the