Skip to main content

VIDEO – California freeway bridge demolition in progress

July 20, 2015
A bridge demolition job is underway in California at present. The Carmenita Road Bridge, which crosses the Santa Ana Freeway, is being removed in stages. The work is being carried out at night when the I-5 route is closed to traffic, so as to minimise the impact for daytime peak traffic flow. The work is being carried out by a specialist contractor on behalf of 5246 Caltrans in the Santa Fe Springs area. The three week job is being closed overnight seven days a week between Rosecrans and Valley View avenues. The work forms part of the Carmenita Road Interchange project. The new Carmenita Bridge has been built and features four traffic lanes in either direction, compared with two lanes for the old bridge now being demolished.

For more information on companies in this article

Related Content

  • Zimbabwe road upgrade being planned
    February 4, 2019
    Construction work for the Beitbridge to Victoria Falls road upgrade project is expected to start shortly.
  • Damaged Norwegian bridge undergoes successful demolition
    February 23, 2015
    A demolition team has successfully demolished the damaged southern lane of the Skjeggestad Bridge in Norway. Located in Vestfold, the bridge was damaged some weeks ago when the ground around its foundations slipped. The explosive demolition project was technically challenging due to the proximity of the bridge carrying the northern lanes but did go to plan according to Norway’s Public Roads Administration (NPRA). Initial plans to repair the Skjeggestad Bridge proved impractical and the decision was made to
  • Bridge lift in Orlando for interstate rebuild
    July 4, 2019
    Measuring 33.8km long and costing US$2.3 billion, Orlando’s massive I-4 Ultimate is the largest infrastructure project in the Florida Department of Transportation’s history. Divided into four phases, the project requires major bridge work to improve traffic flow through Central Florida. In all, 13 existing structures are being widened, 53 new bridges added and 74 bridges replaced. Area 2, currently under construction, runs through Orlando from Highway 50 at the northern edge to the Highway 423/I-4 interc
  • Texas highway project tackles congestion
    April 10, 2012
    A new highway project in Texas will tackle peak congestion