Skip to main content

Roadtec RX-600eLR miller cuts flush to left and the right

April 15, 2016

Astec has brought its new Roadtec RX-600eLR half-lane milling machine to bauma 2016. Able to cut flush on the left and the right hand side of the road, the RX-600eLR offers contractors a 2m-wide, 60cm-deep cutter and a drum driven by two hydrostatic motors, one mounted on either side of the machine.

Exhibitions

Related Content

  • Asphalt plant technology meets market needs
    February 16, 2012
    Plants for mixing asphalt are becoming more sophisticated than ever, while users are looking for ecological and technological benefits. Patrick Smith reports. When the Adige Bitumi Group decided to renew its old M 260 plant it chose to collaborate with Marini for the design and development of a plant with production of 280-300tonnes/hour.
  • Compacting a parking area
    January 18, 2024
    A compaction job for a parking area in Germany posed challenges for the contractor. The work was being carried out for a supermarket carpark in Niederkassel, Germany.
  • An array of barrier innovations is coming to market
    January 4, 2013
    Various developments are affecting the market for highway barriers - Mike Woof writes The global market for highway barrier products continues to see the introduction of new products and new standards. Some standards for barriers are also eagerly awaited and clarification is still required of the regulations surrounding motorcycle-safe barrier types. In recognition of the issues concerning bad weather on Europe’s roads in winter periods, a new amendment has been made to the EN1317 standard for safety barrie
  • Vögele sets paving record in German capital
    September 16, 2015
    Material transfer vehicles and remixing systems are crucial to delivering quality paving. Using material transfer vehicles (MTVs) can play a major role in delivering high quality road surfaces. These units can help boost quality by minimising the risk of material or thermal segregation. A major road paving project has been carried out in Germany using innovative paving methods. For the first time ever, binder and surface courses were paved over a width of 15.5m. This paving job was carried out on a 4.2km st