Skip to main content

Lift off for Terex’s AggreSand 206

January 6, 2017
Terex Washing Systems’ AggreSand 206 wash plant is capable of handling up to 400 tonnes of material every hour, allowing customers to produce more – and better quality – grades, with a number of installations planned worldwide.
Exhibitions

Related Content

  • Bridge work is no problem for Terex concrete paver Bid-Well 3600
    May 30, 2018
    Terex says that its Bid-Well 3600 automatic paver roller is flexible enough to deliver high-quality paving for both slab-on-grade and bridge applications. Meeting a variety of inline paving and skewed bridge designs, the 3600 paver offers standard paving width configurations from 2.4-26.2m with on-the-fly paving widths changes of up to 9.1m. It quickly adapts to the contractor’s bridge deck placement and slab-on-grade paving needs. Kraemer North America recently used an MLC300 to help replace an 84-ye
  • Liebherr’s dozer factory in Austria
    May 4, 2022
    Liebherr is seeing strong demand for earthmoving machines, with healthy output at its earthmoving equipment factories
  • Heavy equipment transport
    February 14, 2012
    Several manufacturers are now offering new solutions for moving heavy construction equipment, with German firms DOLL, Goldhofer and Zandt all introducing new models. DOLL says that its compact Panther units feature new running gear that is said to improve on-road handling and load capacity considerably over competing products in the same size class.
  • Vögele sets paving record in German capital
    September 16, 2015
    Material transfer vehicles and remixing systems are crucial to delivering quality paving. Using material transfer vehicles (MTVs) can play a major role in delivering high quality road surfaces. These units can help boost quality by minimising the risk of material or thermal segregation. A major road paving project has been carried out in Germany using innovative paving methods. For the first time ever, binder and surface courses were paved over a width of 15.5m. This paving job was carried out on a 4.2km st