Skip to main content

Gift giveaways: the search continues

April 22, 2015
Finding the best free gift at this year’s INTERMAT is a real challenge – and from rugby balls to biscuits there is a lot to choose from: but in a jam-packed, hectic environment, the greatest giveaway of the day is something that should help you relax.
Exhibitions

Related Content

  • Advances in road markings
    March 16, 2012
    Recent months have seen many major and vital road marking projects and products completed and tested in different parts of the world. Guy Woodford looks at some of them in Europe, North America, the Middle East and Africa. The London borough of Kensington and Chelsea now has one of the most dramatic streetscape designs in Europe. Exhibition Road’s striking chequered granite design, featuring a single surface running from South Kensington Station to Hyde Park and the full width of the road from building to b
  • Overlay extends bridge's life
    July 24, 2012
    More than 3,000 vehicles a day pass over the US-95 Bridge over Lake Creek near the Coeur D'Alene Tribal Casino in Worley, Idaho, USA. The original deck, built in 2007, was poured concrete with a micro-silica layer added for protection. A QTT weather station with FreezeFree anti-icing technology is mounted in the bridge rail. With big variances in temperature and a lot of wind in this region, the original deck material became thick causing a near 80m length of micro-silica to over-harden. Idaho DOT engineers
  • Volvo CE stages successful six-site paving demo
    April 11, 2013
    Volvo Construction Equipment’s (CE) dealer in the Netherlands, Kuiken, recently hosted a live, five-day demonstration program using a Volvo P7820C ABG paver machine. On a road trip across the country, the Kuiken team visited six different customers, travelling more than 1,700km in total, and clocking up more than 60 hours of paving. “We wanted to test how the market and existing customers, as well as potential ones, would react to the Volvo P7820C ABG machine,” says Arjen Mostert, sales & support manager of
  • Transylvanian motorway breaks new ground in engineering
    July 11, 2012
    Normally in hilly ground, we would use the excavated soil from the cuttings to fill the valleys," says Bogdan Sgarcitu, External Affairs Manager of construction company Bechtel. "But on this stretch the clay-like soil cannot be compacted, so we've had to use many more piles than normal: in just three months we installed more than 500, some drilled as deep as 24m. We've also had to transport millions of tonnes of materials over some less-than-perfect infrastructure."