Skip to main content

CEMEX's clever range of concrete solutions

April 21, 2015
CEMEX is using World of Concrete Europe 2015 to show off a clever range of solutions that include permeable concrete with water flowing through it, lightweight concrete that floats on air, insulating concrete over flames and a highly flexible concrete that uses steel fibres rather than rebar.
Exhibitions

Related Content

  • Liebherr’s truck-mounted 37 Z4 XXT concrete pump
    January 6, 2017
    A truck-mounted concrete pump configured in four sections, Liebherr’s 37 Z4 XXT’s 37m distributor boom in Z-fold design is said to be extremely torsion resistant, and consequently exhibits low-vibration boom movements on the building site. The concrete pipeline on the 37 Z4 XXT is configured close to the boom on the left and right-hand sides, guaranteeing a balanced weight distribution. The pipe bends of the concrete pipeline feature a large radius of 27.5cm ensuring minimal losses in pressure over the le
  • Lighting innovations boosting brightness, cutting costs
    January 27, 2014
    CU Phosco’s new P850 LED main road lantern has just seen its first major deployment – between Junctions 16 and 17 of the A55, a strategic road which skirts the North Wales coastline – Jason Barnes reports The A55 is a grade-separated dual carriageway also known as the North Wales Expressway. Some 139km long, it originally ran from Chester to Bangor but was extended across the Isle of Anglesey into Holyhead Docks in 2001 under a project part-funded by the European Union.
  • Repairs to piers on Italian viaduct
    July 17, 2012
    Hydrodemolition played a vital role in the repairs and strengthening of the multi-span Rio Verde Viaduct, one of the tallest in Europe, that carries the busy dual two-lane A15/E33 Autostrada della Cisa over a steep-sided valley in the municipality of Pontremoli, north-west Italy. Conjet hydrodemolition equipment was used to remove damaged concrete from the faces of the viaduct's rectangular concrete piers, which rise up to 136m from the valley bottom to the steel deck. A new and thicker concrete skin was th
  • Repairs to piers on Italian viaduct
    July 17, 2012
    Hydrodemolition played a vital role in the repairs and strengthening of the multi-span Rio Verde Viaduct, one of the tallest in Europe, that carries the busy dual two-lane A15/E33 Autostrada della Cisa over a steep-sided valley in the municipality of Pontremoli, north-west Italy. Conjet hydrodemolition equipment was used to remove damaged concrete from the faces of the viaduct's rectangular concrete piers, which rise up to 136m from the valley bottom to the steel deck. A new and thicker concrete skin was th