Skip to main content

California bridge demolition project proceeding to plan

March 2, 2015
Demolition work is proceeding to plan on the old Bay Bridge in California. The structure is being removed piece by piece in a tightly controlled demolition project being carried out by a number of specialist firms. Strict guidelines cover how the demolition workers can proceed, with regulations preventing debris from falling into the water for example. Safety of the demolition personnel is another of the key criteria. The new bridge is already carrying traffic alongside but the old steel cantilever structure can only be removed in sections and this has meant certain parts of the new link cannot be completed until the original structure has been taken down. The project team will remove the old bridge down to the water level but discussions are underway at present in how best to remove its foundations underwater also. By the end of 2016, the old structure should be completely removed however.

Related Content

  • Presidio Parkway: the Golden Gate Bridge’s new southern approach road
    May 29, 2013
    Work on the Presidio Parkway, a new breathtaking and eco-friendly southern approach road to San Francisco’s Golden Gate Bridge, has entered its crucial second and final phase. As Guy Woodford reports, the vital US$1 billion project has overcome legal as well as environmental challenges to stay on course for its expected 2016 completion Just after 9pm on Friday April 27, 2012 a large public crowd looked on excitedly as a fleet of more than 40 R&L Brosamer and Ferma Corporation deployed hydraulic demolition h
  • Dowel bar drilling selection poses challenges
    January 11, 2013
    Pneumatic concrete dowel drills have one purpose – to drill holes. While their intended use is easy to recognize, operation of this equipment isn’t quite so simple. In fact, it’s a bit of a science. That’s not to say they’re difficult to operate. But there are certain best practices and processes to keep in mind for proper drill operation, whether it’s an on-grade, slab-rider or equipment-mounted model. Operators who adopt these guidelines and implement them on every job are rewarded with better performance
  • Colombia bridges for redesign and repairs
    October 12, 2020
    Two key Colombian bridges are to be redesigned and repaired.
  • VIDEO: Bridge demolition on key A90 route in Scotland
    November 4, 2015
    Demolition work has been carried out on a bridge crossing the busy A90 route in Scotland, just to the north of the capital, Edinburgh. The bridge carried the B900 over the A90 but had to be removed as its narrow design prevented the route from being upgraded to full motorway status. The first stage of the demolition work was carried out on October 24th and 25th, with the second stage on October 31st and November 1st and final remedial work to be carried out on November 14th and 15th.