Skip to main content

Brazil’s budget cuts threaten the Santos-Guaruja immersed tunnel

August 18, 2015
Adjustments to Brazil's budget could pose a threat to the planned immersed tunnel between Santos and Guaruja in Sao Paulo state, local media reported.

Sao Paulo state had put the project out to tender and had verbal support from the national treasury to borrow up to US$2 billion to finance the project. However, because of the economic crisis, this support has not materialised.

The tunnel would by 1.7km long, carry six lanes of traffic and be at an estimated depth of 35m.

Out of $918 million needed for the tunnel, Brazil's national development bank BNDES had already approved $269 million while the state of Sao Paulo had committed $258 million, leaving a $373 million gap. Sao Paulo state has half the resources needed already but it will not go ahead with the project until all the funds are available, local media reported.

Out of five consortia that presented a commercial proposal, four are prequalified: ISG Interligacao Santos-Guaruja, made of 1339 Andrade Gutierrez, 3086 Daewoo and CR Almeida; Nova Travessia, made of Constran, Ing E Mantovani and Piacentini Tecenge do Brasil; Tunel Santos-Guaruja, made of 1305 Odebrecht, Queiroz Galvao, 1511 OAS and Strukton; Sigma, made of J Malucelli Construtora de Obras, Grandi Lavori and 7809 Salini Impregilo; and Construtor Tunel Santos-Guaruja, made of Camargo Correa, 2717 Ferrovial Agroman and Carioca Engenharia.

Sao Paulo’s state highway agency 2529 Dersa has produced a video of the proposed submerged tunnel.

For more information on companies in this article

Related Content

  • Slovakia tunnel excavation complete
    September 21, 2018
    Excavation work on Slovakia’s Visnove Tunnel has now been completed. Driving the tunnel took nine months longer than originally anticipated. The 7.5km tunnel will be Europe’s seventh longest when complete and forms part of the D1 highway between Dubna Skala and Lietavska. Work on this highway started in 2014, with the construction being carried out jointly by Italian contractor Salini Impregilo and local firm Duha. Fitting out of the tunnel is now commencing, with equipment such as ventilation and traffic
  • Colombia’s ANI agency is driving forward the 4G PPP programme
    April 4, 2016
    Andrade Moreno is a man on a mission. The head of Colombia's infrastructure agency ANI explains how the organisation is giving foreign companies increasing confidence to invest time and money in the country. David Arminas reports Change, especially when it touches the highest levels of South American business and politics, can bring with it personal danger. Luis Fernando Andrade Moreno, president of Colombia's National Infrastructure Agency - ANI - was aware of this when he took on the role in 2011. B
  • LiuGong opens factory in Mogi Guaçu, Brazil
    April 9, 2015
    LiuGong Machinery, a major Chinese maker of heavy construction equipment, said it will invest around US$38 million in manufacturing in Brazil. The announcement was made during the opening ceremony of its first factory in Brazil, in the city of Mogi Guaçu, around 180km from São Paulo. LiuGong expects to produce 1,500 wheel loaders and excavators annually at the facility in the first three years of operation.
  • Huesker success in Milton Vargas Award
    December 14, 2012
    Huesker is celebrating victory in this year’s Milton Vargas Award. Now in its second year and honouring the pioneer of soil mechanics in Brazil who died in May 2011, the Milton Vargas Award is an initiative of the Brazilian magazine Fundações and Obras Geotécnicas. It recognises the work of professionals responsible for planning, design and implementation of large construction projects, whose works have already featured prominently in the magazine. Technical director Dr. Dimiter Alexiew (Huesker Germany); r