Skip to main content

Brazil’s budget cuts threaten the Santos-Guaruja immersed tunnel

August 18, 2015
Adjustments to Brazil's budget could pose a threat to the planned immersed tunnel between Santos and Guaruja in Sao Paulo state, local media reported.

Sao Paulo state had put the project out to tender and had verbal support from the national treasury to borrow up to US$2 billion to finance the project. However, because of the economic crisis, this support has not materialised.

The tunnel would by 1.7km long, carry six lanes of traffic and be at an estimated depth of 35m.

Out of $918 million needed for the tunnel, Brazil's national development bank BNDES had already approved $269 million while the state of Sao Paulo had committed $258 million, leaving a $373 million gap. Sao Paulo state has half the resources needed already but it will not go ahead with the project until all the funds are available, local media reported.

Out of five consortia that presented a commercial proposal, four are prequalified: ISG Interligacao Santos-Guaruja, made of 1339 Andrade Gutierrez, 3086 Daewoo and CR Almeida; Nova Travessia, made of Constran, Ing E Mantovani and Piacentini Tecenge do Brasil; Tunel Santos-Guaruja, made of 1305 Odebrecht, Queiroz Galvao, 1511 OAS and Strukton; Sigma, made of J Malucelli Construtora de Obras, Grandi Lavori and 7809 Salini Impregilo; and Construtor Tunel Santos-Guaruja, made of Camargo Correa, 2717 Ferrovial Agroman and Carioca Engenharia.

Sao Paulo’s state highway agency 2529 Dersa has produced a video of the proposed submerged tunnel.

For more information on companies in this article

Related Content

  • Bidders announced for Panama project
    June 18, 2012
    The consortium made up of Acciona Infraestructuras and Tradeco from Spain and Mexico and the consortium made up of Odebrecht and Hyundai Joint Venture from Brazil and South Korea plus Vinci Construction Grands Projets from France have pre-quali ed in the tender for the construction of a new bridge at the Atlantic side of the Panama Canal. The second stage of the selection process will involve the client Panama Canal Authority (ACP) sending the contract terms and conditions to bidders. The 75m high and 4.6k
  • Indeco breakers assist on building new Mexican roads
    January 14, 2019
    Indeco breakers have played important roles in two key road projects in Mexico, at Acapulco and Querétaro.
  • Brazilian mine and infrastructure projects create jobs
    June 11, 2012
    A huge $5 billion Brazilian mine project together with extensive infrastructure developments is expected to create 8,000 jobs Huge export opportunities in Brazil, including equipment for aggregate production and highway construction, are being highlighted by the UK Construction Equipment Association (CEA). UK Trade & Investment (UKTI) has appointed the CEA to deliver a UK Information Share Fair and extended Trade Mission to Brazil to promote a major high value opportunity for UK manufacturers and service pr
  • The world’s longest suspension bridge
    June 24, 2024
    The world’s longest suspension bridge is the 1915 Çanakkale Bridge in Turkey. This engineering marvel links Gelibolu with Lapseki, forming a key section of the 101km highway linking Malkara with Çanakkale. *Article produced in partnership with the General Directorate of Highways (KGM), Ministry of Transport and Infrastructure, Republic of Türkiye.