Skip to main content

BOMAG puts in a lap at Mandalika race track

Set on the tranquil Indonesian tourist island of Lombok, the Mandalika Street Circuit is set to become one of the most exciting tracks in the international motorcycle racing calendar.
November 23, 2021

The new MotoGP circuit for motorcycles is basically a street course but designed so that part of it is closed to public traffic during race weekends. The surface of a racetrack is crucial for the grip and tyre wear of the motorcycles. Therefore, the track surface must meet the highest standards.

BOMAG paving and compaction equipment was selected to install the asphalt elements of the track.

For paving the asphalt course layers, two BOMAG BF 800 C pavers where used. The compaction was done by 10 tonne BOMAG tandem rollers BW 161 AD-4 and pneumatic tyre rollers type BW 24 RH.

Exhibitions

For more information on companies in this article

Related Content

  • Paving with recycled waste in South Africa
    November 28, 2022
    Trials have been completed successfully using asphalt manufactured with recycled waste plastic in KwaZulu Natal, South Africa. Simon Tetley, of VNA Consulting and ARRB Systems, explains the process.
  • Success of hot mix asphalt road recycling
    March 7, 2012
    Russian construction firm Kamdorstroy has carried out a successful demonstration of recycling techniques to over 60 highway officials, academics and contractors from all over the CIS states. The demonstration was carried out in co-operation with the Russian Federal Highway and Tatarstan Highway authorities and involved milling, recycling and overlaying a road with hot mix asphalt. The work was carried out on a 7.5m wide roadway with 3.8m wide lanes (with an overlap) using machinery and techniques new to Rus
  • Trends in asphalt plant innovations
    August 27, 2019
    Key trends exist in the asphalt plant market, with manufacturers focussing on meeting customer needs and industry trends
  • Asphalt resurfacing at Miami International Airport
    February 8, 2012
    Improvements worth US$30 million are being carried out at Miami International Airport. The work includes runway resurfacing with specialist contractors having been brought in to handle the project. This is a busy facility handling some 34 million passengers/year and the work is being carried out over a period of 454 days in all, starting in September 2009 and due to finish in December 2010. The focus of attention is the upgrade to the airport's second longest runway, 8R 26L as well as the adjoining M and N