A 50-tonne prototype dump truck is the centrepiece of Bell’s impressive stand at INTERMAT 2015 and offers a real glimpse of the heavy construction industry’s future.
Plans are moving forward for the construction of a new highway tunnel under the River Elbe in Germany. The 6.5km tunnel will form part of the A20 autobahn linking Bad Segeberg and Bremerhaven. The tunnel will be constructed Glückstadt and Drochtersen and a section of the A26 autobahn that connects with the busy port city of Hamburg. The project is expected to cost some €2 billion to construct. Bids are already being submitted, including an offer by French firm Vinci using the PPP model and intended to share
The 600m cable-stayed Kömürhan Bridge rises around 165m over eastern Turkey’s Karakaya Dam Lake and is part of the Malatya-Elazig State Highway. The bridge is the fourth single-pylon cable-stayed bridge in the world and is due to open in July.
A Manitowoc 2250 crawler crane and a Grove GMK6250L all-terrain crane have been used to help construct a two-story underground parking structure at a mixed-use apartment complex at Minnesota in the US.
The cranes were rented from Vic’s Crane and Heavy Haul by Hanson Structural Precast, the precast subcontractor working for general contractor Frana Companies. The two cranes lifted and placed the precast concrete wall panels and flooring sections. The heaviest load, an 18m double T floor section, weighed 29.