Strong interest is being shown in the coming Eurasphalt & Eurobitume Congress. Pavement durability and reduced temperature asphalt technologies are key topics of the Eurasphalt & Eurobitume Congress 2012, to be held this June in Istanbul from 13th-15th June 2012. This fifth Eurasphalt & Eurobitume Congress (E&E 2012) already has a strong line-up of speakers and delegates, with the programme being fine-tuned to meet expectations. Over 800 delegates are expected to attend the event, which will provide detaile
Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
Doka’s formwork expertise is currently in demand during the construction of one of the busiest motorway viaducts in Germany. The 400m six-lane Lahntal Bridge in Limburg dates from the early 1960s. Every day about 100,000 vehicles cross the bridge that spans the valley of the River Lahn. But traffic loads have increased sharply, so a new bridge is being built sited just a few metres west of the old viaduct.
The new Lahntal viaduct will measure a massive 43.5m in width, enabling eight lanes plus hard shoul