Skip to main content

Trunk route to damage

Circus elephants took out their anger and frustration on parked cars recently in Denmark. One of the animals was wading in the sea and was hit by a trainer for not following his instructions. The animal reacted by breaking free along with two others, chasing tourists and battering a number of cars. A woman was knocked to the ground and suffered slight injuries. The circus said however that the tourists should not have been so close to the elephants and claimed that as the cars should not have been parked th
September 11, 2015 Read time: 1 min
Circus elephants took out their anger and frustration on parked cars recently in Denmark. One of the animals was wading in the sea and was hit by a trainer for not following his instructions. The animal reacted by breaking free along with two others, chasing tourists and battering a number of cars. A woman was knocked to the ground and suffered slight injuries. The circus said however that the tourists should not have been so close to the elephants and claimed that as the cars should not have been parked there, it was not responsible for any of the damage caused.

Related Content

  • Brazil's flood damage
    February 23, 2012
    Major repairs are required to roads and bridges in Brazil's Rio de Janeiro State following the recent spate of flooding.
  • Brazil's flood damage
    May 3, 2012
    Major repairs are required to roads and bridges in Brazil's Rio de Janeiro State following the recent spate of flooding. In all 185 bridges and five roads will have to be repaired or rebuilt, with the work expected to cost in the region of US$237.6 million. Severe weather conditions caused the flooding, which was particularly heavy in in the hilly regions of Nova Friburgo, Teresopolis, Sumidouro, Petropolis, Bom Jardim, Sao Jose do Vale do Rio Preto and Areal.
  • Volvo CE stages successful six-site paving demo
    April 11, 2013
    Volvo Construction Equipment’s (CE) dealer in the Netherlands, Kuiken, recently hosted a live, five-day demonstration program using a Volvo P7820C ABG paver machine. On a road trip across the country, the Kuiken team visited six different customers, travelling more than 1,700km in total, and clocking up more than 60 hours of paving. “We wanted to test how the market and existing customers, as well as potential ones, would react to the Volvo P7820C ABG machine,” says Arjen Mostert, sales & support manager of
  • Denmark concerned over rising cost of Fehmarn Belt Fixed Link
    February 19, 2015
    The Danish government is in talks with contractors over the latest rise in cost estimates for the proposed prestigious Fehmarn Belt Fixed Link between Denmark and Germany. Contractors have estimated an extra €295.5 million will be needed. This is in addition to a statement last November by the contracting company Femern saying that costs had risen nearly €900 million. The total rise price hike is nearly €1.2 billion. This puts the final cost of the 18km tunnel including two railway tunnels, two motorway tun