Skip to main content

Trimble offering sophisticated package of solutions

Trimble says that its latest Connected Site solutions offer improved efficiency for connecting workers, machines and projects across the planning, design and construction lifecycle. These technologies suit use by heavy civil contactors and site preparation contractors. Trimble’s mix of hardware, software and mobility technologies streamlines communication and collaboration throughout the construction lifecycle, from planning, design and site preparation through to the finished project. Connecting people
February 2, 2015 Read time: 3 mins
Trimble’s connected site offers greater efficiency
2122 Trimble says that its latest Connected Site solutions offer improved efficiency for connecting workers, machines and projects across the planning, design and construction lifecycle. These technologies suit use by heavy civil contactors and site preparation contractors.

Trimble’s mix of hardware, software and mobility technologies streamlines communication and collaboration throughout the construction lifecycle, from planning, design and site preparation through to the finished project. Connecting people, machines and projects delivers real-time data to contractors and project stakeholders for enhanced information about material, people and asset utilization, resulting in improved productivity.

The latest capabilities provide now deliver greater quantities of accurate real-time information and data in the field, in the office and throughout the project. Boosting the information flow is said to enable contractors to achieve faster project completion with reduced costs, improved safety and lower environmental impact according to Trimble.

These solutions can improve the workflows of grading and excavating contractors, paving contractors, drilling and piling contractors, and site and utility contractors. The Connected Worker allows users to wirelessly synchronise data in the field with the office and receive GNSS corrections via the Internet. A grade checker, construction surveyor, supervisor and other field personnel can receive the 3D constructible design model, generate new measurements and send the measurement and stakeout results back to the office for review. Design changes originating in the office can be sent to field crews so they are updated with current information.

The Connected Machine offering is now standard in all Trimble Grade Control Systems and helps contractors manage assets and see what machines are doing. Machines can collect as-built measurement data for office delivery, and receive GNSS corrections using the Internet. A 3D constructible model created in the office can be sent to the machine operator for faster, more precise grading and earthmoving. The machine can be used for volume measurements, so expensive measurements by grade checkers occur less frequently.

With the Connected Project, contractors to build 3D construction models, perform data preparation and take-off, wirelessly synchronise data, monitor site productivity, and manage fleets and assets. The 3D design model can be sent to machines and controllers in the field, increasing efficiency, reducing rework and saving money. Additionally, a complete view of site productivity including materials quantity and movement, volume and compaction data, and fleet and asset management information can be shared across the organisation for better decision-making and communications.

For more information on companies in this article

Related Content

  • Engcon's powerful new EC233 tiltrotator and Trimble guidance
    June 3, 2019
    Engcon has announced that the company’s new EC233 series tiltrotator is in full production. According to the Swedish manufacturer, the EC233, with a break torque of 340kNm, will be the market's most powerful tiltrotator for excavators between 24-33tonnes. The EC233 replaces Engcon’s EC30, which has been in production since the mid 1990's, notes Robert Hunt, managing director of Engcon UK. The product development cycle was focused on destructive tests where both mountings and connectors were exposed to
  • Upgrades by Power Pavers ensure old generation slipformer uses new Topcon machine control system
    July 1, 2013
    Upgrades to a slipform concrete paver built in 1999 allow it to use current technology. US firm Streb Construction has taken a novel approach to its paving fleet by upgrading a CMI paver built in 1999 to use modern machine control technology. The company bought the CMI SF3302 machine new and this piece of equipment had logged a high number of hours since its purchase. However the company realised that this proven piece of equipment could be made to operate more efficiently and productively, as well as more
  • MOBA’s innovative drill control offers efficiency
    January 6, 2017
    MOBA continues to develop its novel MDS-2000 drilling system. This package has already proven itself in use for blast hole drilling in many operations and can now be used to record the orientation of the machine with GNSS antennae and the height using laser reference. With telesupport, MOBA also offers fast service through an Internet connection. By recording the machine orientation using two GNSS antennae, the torsion on the machine can be determined with very high accuracy and included in the calculation
  • Komatsu introducing intelligent excavator
    December 8, 2014
    Komatsu has continued its development of Intelligent Machine Control (IMC) systems, in cooperation with global partner Topcon, with the launch of the PC210LCi-10, the first fully integrated OEM machine control crawler excavator. Unlike its IMC-equipped D61PXi/EXi dozer that was introduced last year, the popular 21 tonne excavator has been unveiled first in Europe, rather than in Japan or the USA. The machine, which is built at Komatsu UK’s excavator plant in Birtley in the North East of England, offers sem