Skip to main content

Trimble offering sophisticated package of solutions

Trimble says that its latest Connected Site solutions offer improved efficiency for connecting workers, machines and projects across the planning, design and construction lifecycle. These technologies suit use by heavy civil contactors and site preparation contractors. Trimble’s mix of hardware, software and mobility technologies streamlines communication and collaboration throughout the construction lifecycle, from planning, design and site preparation through to the finished project. Connecting people
January 6, 2017 Read time: 3 mins
Trimble’s connected site offers greater efficiency
2122 Trimble says that its latest Connected Site solutions offer improved efficiency for connecting workers, machines and projects across the planning, design and construction lifecycle. These technologies suit use by heavy civil contactors and site preparation contractors.

Trimble’s mix of hardware, software and mobility technologies streamlines communication and collaboration throughout the construction lifecycle, from planning, design and site preparation through to the finished project. Connecting people, machines and projects delivers real-time data to contractors and project stakeholders for enhanced information about material, people and asset utilization, resulting in improved productivity.

The latest capabilities provide now deliver greater quantities of accurate real-time information and data in the field, in the office and throughout the project. Boosting the information flow is said to enable contractors to achieve faster project completion with reduced costs, improved safety and lower environmental impact according to Trimble.

These solutions can improve the workflows of grading and excavating contractors, paving contractors, drilling and piling contractors, and site and utility contractors. The Connected Worker allows users to wirelessly synchronise data in the field with the office and receive GNSS corrections via the Internet. A grade checker, construction surveyor, supervisor and other field personnel can receive the 3D constructible design model, generate new measurements and send the measurement and stakeout results back to the office for review. Design changes originating in the office can be sent to field crews so they are updated with current information.

The Connected Machine offering is now standard in all Trimble Grade Control Systems and helps contractors manage assets and see what machines are doing. Machines can collect as-built measurement data for office delivery, and receive GNSS corrections using the Internet. A 3D constructible model created in the office can be sent to the machine operator for faster, more precise grading and earthmoving. The machine can be used for volume measurements, so expensive measurements by grade checkers occur less frequently.

With the Connected Project, contractors to build 3D construction models, perform data preparation and take-off, wirelessly synchronise data, monitor site productivity, and manage fleets and assets. The 3D design model can be sent to machines and controllers in the field, increasing efficiency, reducing rework and saving money. Additionally, a complete view of site productivity including materials quantity and movement, volume and compaction data, and fleet and asset management information can be shared across the organisation for better decision-making and communications.

For more information on companies in this article

Related Content

  • Trimble Dimensions proving successful in new venue
    November 9, 2016
    The Trimble Dimensions 2016 users conference opened its doors to a record attendance on 7th November, 2016.
  • Trimble’s VisionLink technology offers efficiency
    April 23, 2014

    2122 Trimble’s sophisticated VisionLink solution offers contractors the chance to utilise machine fleet data in a more efficient and effective way. This provides a method for connecting the telematics data generated by each piece of equipment, no matter the supplier or the machine’s location, into a single reporting system for the contractor. Monitoring assets closely provides greater transparency while the two-way information flow also allows data to be passed back onsite, where it is needed.

  • Paving a Japanese airport within strict time constraints
    September 19, 2012
    In Japan, major efforts are being made to both conserve energy and materials, while also delivering high quality airport runways. At Haneda Airport, as well as at the Fukuoka, Chitose and Sendai airports, innovative use is being made of asphalt paving equipment from Sumitomo. The latest model HA60W J paver from Sumitomo is being used to lay warm mix asphalt, while the contractors is also using sophisticated control technology. To minimise disruption to flight schedules, construction work at Haneda has been
  • It’s a level playing field with Leica’s iCON gps 70 Series
    April 27, 2018
    Efficiency is the name of the game from the iCON gps 70 Series, a GNSS rover from Leica Geosystems. With the iCON gps 70 T you can measure and stakeout points faster and without the need to keep the pole vertical and level the bubble. The combination of the latest GNSS technology and inertial measurement unit (IMU) equips the iCON gps 70 T with permanent tilt compensation and makes it resistant to any magnetic interference. Because the iCON gps 70 T is calibration-free, it can be ready instantly and any