Skip to main content

Triangle's tracking tyre tool

By Mike Woof June 20, 2025 Read time: 1 min
Triangle Tyre offers a new remote tyre monitoring system

A new tool from Triangle Tyre is said to optimise reliability for users. The TPMS system from the firm allows remote monitoring of tyres fitted to large construction machines.

This can help boost uptime and reduce costly downtime. Temperatures and pressures can be monitored to ensure reliability. The TPMS unit offers comprehensive, real-time tyre tracking and monitoring capabilities, boosting site safety and minimising unplanned and costly machine downtime.

For more information on companies in this article

Related Content

  • The concrete option
    July 31, 2012
    Concrete highway construction techniques and technology continues to evolve. Mike Woof reports The recent increases in oil costs are having a knock-on effect for the road construction sector, as asphalt prices have increased noticeably and faster than those for concrete. This has spurred renewed discussion over which construction technique now offers the best long term solution for road building. The debate between those in favour of concrete and those preferring asphalt for highway construction has been on
  • Solar lighting trial for road construction
    June 28, 2018
    Successful trials have been carried out of mobile solar lighting for road construction activities. The mobile solar-powered lighting is said to offer cost savings for highways contractors and trials of the Prolectric ProLight have demonstrated its carbon and air quality benefits as an alternative to temporary diesel lighting towers. The technology has been pioneered by Prolectric to deliver year-round solar lighting and optimise winter performance. Temporary lighting frequently has to be deployed in heavi
  • Wheeled loaders cut cycle times, boost productivity
    February 14, 2012
    With the Tier 4 interim/Stage IIIB emissions requirements due next year, further upgrades will be required for all wheeled loaders sold in Europe and North America.
  • Wheeled loaders cut cycle times, boost productivity
    April 4, 2012
    With the Tier 4 interim/Stage IIIB emissions requirements due next year, further upgrades will be required for all wheeled loaders sold in Europe and North America. In the mean time manufacturers are focussing on improvements that cut cycle times, boost productivity and reduce downtime for example. From Doosan comes the DL420 wheeled loader, which takes over from the previous DL400 and is aimed at use in a range of materials-handling work. The DL420 features a 4m3 bucket and is a 22.3tonne machine that