Skip to main content

Tough temporary tracks from Roland

UK firm Roland Plastics says that its novel Durapath product has achieved recognition for its longevity and durability.
August 31, 2020 Read time: 2 mins
Roland Plastics is now offering the durable Durapath temporary trackway product

The firm has been working with the United Kingdom National Codification Bureau (UKNCB) to gain four Nato Stock Numbers (NSN) for the material.

This is a key development as Nato Stock Numbers (NSN) are issued after rigorous analysis and mean that products can be listed for purchase across any Nato country. This allows businesses to achieve trading relationships, in particular with the military, and other major infrastructure organisations.

The Durapath product is now being used by the Royal School of Military Engineers for a project to deploy a rapid build road surface.

The product is made from 100% recycled plastic, offers efficient drainage and can be used for motorway cnstruction sites and heavy-use car parks and factory settings.

It comes in two colours (sand and black) in 1m2 sheets and 59m2 pallets.

With its high-strength material and clipping system, Durapath can be used in heavy traffic areas with both wheeled and tracked vehicles.    

According to the firm, this is a durable product that provides a permanent ground solution, and replaces the need for traditional and costly hard-standing products. Durapath’s design conforms to the Sustainable Urban Drainage Systems Laws (SUDS) and allows water to permeate through the ground, while being strong enough to take the heaviest of day-to-day loads.

Related Content

  • Modular water treatment solutions
    March 29, 2021
    Siltbuster has provided Costain with four modular treatment solutions, to be used during the delivery of the £200 million Preston Western Distributor Road, linking Preston and southern Fylde to the M55 motorway.
  • Modular water treatment solutions
    May 3, 2021
    Siltbuster has provided Costain with four modular treatment solutions, to be used during the delivery of the £200 million Preston Western Distributor Road, linking Preston and southern Fylde to the M55 motorway.
  • Plenty of Energya to deliver job site sustainability
    July 10, 2023
    CIFA has a rich innovation history and a bright future, demonstrated by the concrete machinery specialist's strong presence at the 31st edition of SaMoTer in Verona (3-7 May 2023). Guy Woodford spoke to Marco Polastri, CIFA's sales, aftersales and marketing director, at the well-attended exhibition to hear more about the Italian company's present and future.
  • Tackling the UK's traffic congestion
    February 28, 2012
    The biggest problem on UK roads is congestion, and there is no shortage of ideas as to how it should be tackled. Patrick Smith reports. Congestion (and how to relieve it), along with safety, are among the top priorities facing those responsible for looking after the UK's roads. Road pricing, car-share lanes, greener vehicle initiatives and alternative methods of transport such as buses, trams and rail are all part of the approach, but prior to the current economic climate the nation's love affair with the c