Skip to main content

Toads take the high road

In Scotland's capital Edinburgh baby frogs and toads have had to be cleared from a road running though a public park. Recent weather conditions have been damp yet mild and have been ideal for the amphibians to spawn, with the result that the road around Arthur's Seat has had to be closed to traffic. Park rangers have been busy removing between 400-450 of the tiny baby frogs and toads at a time and moving the amphibians to a safe location.
July 30, 2012 Read time: 1 min
In Scotland's capital Edinburgh baby frogs and toads have had to be cleared from a road running though a public park. Recent weather conditions have been damp yet mild and have been ideal for the amphibians to spawn, with the result that the road around Arthur's Seat has had to be closed to traffic. Park rangers have been busy removing between 400-450 of the tiny baby frogs and toads at a time and moving the amphibians to a safe location.

Related Content

  • East Africa road flooding causes damage
    May 22, 2018
    Heavy rains across East Africa have caused major problems to road links for the region. The rains have resulted in roads being washed away in rural areas, while urban areas have also suffered badly. Storm drainage in many areas has proven unable to cope. Kenya’s busy capital Nairobi has seen roads that are normally heavily congested suddenly resemble rivers, with water washing away vehicles and various structures.
  • On track with Cat Mobil-trac
    June 20, 2024
    A UK contractor is making good use of its latest Cat Mobil-trac paver for urban resurfacing work.
  • Sand, gravel and asphalt, building Poland’s roads
    February 24, 2012
    A new quarry is producing top quality aggregates for Poland's massive road construction programme writes Claire Symes. Wakoz Beton's Glazica sand quarry in Poland is a major source of high quality sand and gravels for the Gdansk construction market. The site is modern and only opened in 2006 but Wakoz Beton has continued to invest in facilities to improve its efficiency and output quality. The installation of a CDE mobile washing plant at the site last year is allowing it to provide materials for concrete.
  • A new bridge now crosses a motorway in the UK
    November 5, 2012
    A new 240tonne bridge has now been installed over the M54 as part of a major overnight engineering operation. The single-span bridge, which stretches 45m over the motorway, is part of wider plans to develop a site in South Staffordshire. To allow engineers to winch the giant structure in safely, both carriageways between junctions 2 and 3 were closed on Saturday, November 3rd. Bridge sections were delivered to a near compound early in the summer where it was pieced together. Just after 11.30pm on Saturday,