Skip to main content

Toads take the high road

In Scotland's capital Edinburgh baby frogs and toads have had to be cleared from a road running though a public park. Recent weather conditions have been damp yet mild and have been ideal for the amphibians to spawn, with the result that the road around Arthur's Seat has had to be closed to traffic. Park rangers have been busy removing between 400-450 of the tiny baby frogs and toads at a time and moving the amphibians to a safe location.
July 30, 2012 Read time: 1 min
In Scotland's capital Edinburgh baby frogs and toads have had to be cleared from a road running though a public park. Recent weather conditions have been damp yet mild and have been ideal for the amphibians to spawn, with the result that the road around Arthur's Seat has had to be closed to traffic. Park rangers have been busy removing between 400-450 of the tiny baby frogs and toads at a time and moving the amphibians to a safe location.

Related Content

  • Reflective road markings an aid to road safety
    February 8, 2012
    Horizontal and high-tech in-road markings are all being used in a bid to keep roads safe as Patrick Smith reports. Many modern roads, especially in urban areas, are equipped with the latest technology to guide drivers and, more importantly, improve safety.
  • Alberta to add another wildlife overpass
    April 18, 2022
    The Canadian province said the overpass will be the first outside the federal Banff National Park.
  • Italy road tunnel project excavated
    July 9, 2018
    Italy’s A3 Highway is being upgraded, which will improve transport between Salerno and Calabria. Upgrading Italy’s A3 highway is of prime importance for developing the south of the country and is a project that has been prioritised for construction. The A3 Salerno-Reggio-Calabria highway is a non-toll road managed by ANAS, Italy’s state-owned company that constructs and maintains highways. The route runs a total of 443km, with the road having originally been built between 1966 and 1974. However, the origina
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s