Skip to main content

Students received charges

Five Canadian students received criminal charges when a fun prank they planned went wrong. The engineering students had intended to lower the carcass of a Volkswagen Beetle car from the Iron Workers Memorial Bridge in Vancouver. The students clearly need to spend more time studying as they miscalculated the stresses involved and the cables they selected failed under the load. The car then fell into Vancouver harbour and the students were arrested and charged for causing over C$5,000 of damage. Canadian engi
February 23, 2012 Read time: 1 min
Five Canadian students received criminal charges when a fun prank they planned went wrong. The engineering students had intended to lower the carcass of a Volkswagen Beetle car from the Iron Workers Memorial Bridge in Vancouver. The students clearly need to spend more time studying as they miscalculated the stresses involved and the cables they selected failed under the load. The car then fell into Vancouver harbour and the students were arrested and charged for causing over C$5,000 of damage. Canadian engineering students have a history of car dangling attempts, which is used to publicise engineering week at the University of British Columbia.

Related Content

  • Extreme climates pose tough duty cycles and challenges for testing procedures
    April 5, 2013
    This month we look at how pavement testing technology is responding to extremes of temperature, showcase concrete testing in Doha and look at how water drops could help identify delaminated bridge decks - Kristina Smith reports One of the biggest challenges that pavement engineers face is how to design for extremes of temperature. Designing for cold weather can result in problems at higher temperatures – and vice versa. In Scandinavia, generally a cold climate, they are facing this problem. In the summer,
  • Maximising cone crusher efficiency
    September 30, 2013
    Ensuring efficient cone crusher operation can deliver major economies of scale for quarrying facilities There are a number of ways in which cone crusher throughput can be optimised. One of the key issues is in keeping the system choke fed during operation, as this maximises the effectiveness of rock-on-rock crushing, extends the wear life of manganese components and ensures a quality product shape. A lack of feed causes inconstant loading, which affects the long-term life of internal components.
  • High marks for road marking solutions
    December 3, 2013
    A novel solution based on a leading road marking manufacturer’s proven marking technology is keeping elderly residents safe in a French residential development. Guy Woodford reports on this and other major road marking products and their applications By 2050, it is estimated that 45% of European Union citizens will be over 60. Many authorities have been working to develop and implement safety standards that will ensure enhanced mobility for their local elderly population. As part of their implementation,
  • New funding for 44 infrastructure projects
    December 26, 2024
    New funding awards escalate the launch of 44 major infrastructure projects.