Skip to main content

Scania offers OEMs complete Stage V solution

Engine supplier Scania has a full range of Stage V ready engines on offer to machinery OEMs. Based on the firm’s proven on-highway Euro 6 range, the 9-, 13- and 16-litre engines use both a DPF and SCR with an exhaust additive fluid. In-house engine management, including fuel injection, exhaust after treatment, charge air and engine operating temperatures are all taken care of by a control unit mounted on the cool side of the engine. Scania is currently moving to the same DPF and SCR solution for its on-high
January 6, 2017 Read time: 1 min
Engine supplier 759 Scania has a full range of Stage V ready engines on offer to machinery OEMs. Based on the firm’s proven on-highway Euro 6 range, the 9-, 13- and 16-litre engines use both a DPF and SCR with an exhaust additive fluid. In-house engine management, including fuel injection, exhaust after treatment, charge air and engine operating temperatures are all taken care of by a control unit mounted on the cool side of the engine. Scania is currently moving to the same DPF and SCR solution for its on-highway trucks, and can offer construction buyers a Stage V solution well ahead of the 2019 implementation date.

For more information on companies in this article

Related Content

  • New driveline developments boost machine efficiency
    April 24, 2013
    Advances in transmission technology will help to optimise machine performance – writes Mike Woof. As construction machines have become more sophisticated, so have the transmission systems used in items of equipment. Advances in electronics and software in particular have allowed the development of integrated transmissions. These operate more efficiently and help optimise power delivery from an engine, boosting torque response and cutting fuel consumption and emissions at the same time. The smart electronics
  • It’s Miller time for Doosan excavators and loaders in Scotland
    April 17, 2018
    Scottish Doosan dealer Balgownie has supplied new Doosan DX225LC-5 22tonne and DX255LC-5 25tonne excavators and a new DL420-5 wheeled loader to Miller Plant. Miller Plant offers services from bulk earthworks and contract crushing and screening to plant hire, site clearance, demolition, aggregate supply and heavy haulage and tipper hire. As the machines will do more than 60 hours a week each, they come with a peace-of-mind five-year warranty and Balgownie’s fast response to requests and service support.
  • Doosan DX140LC-5 sets benchmark in 14tonne class
    March 4, 2016
    Part of the company’s new ‘LC-5’ range of machines meeting the latest Stage IV emission regulations, the DX140LC-5 14tonne crawler excavator has been launched by Doosan Construction Equipment. The DX140LC-5 model sets a new benchmark for this class of excavator worldwide, providing greatly improved performance compared to the previous ‘LC-3’ Stage IIIB model. The improved performance of the DX140LC-5 includes a 5% increase in engine power and 4% greater torque. In addition, traction has been booste
  • Doosan DX140LC-5 sets benchmark in 14tonne class
    January 6, 2017
    Part of the company’s new ‘LC-5’ range of machines meeting the latest Stage IV emission regulations, the DX140LC-5 14tonne crawler excavator has been launched by Doosan Construction Equipment. The DX140LC-5 model sets a new benchmark for this class of excavator worldwide, providing greatly improved performance compared to the previous ‘LC-3’ Stage IIIB model. The improved performance of the DX140LC-5 includes a 5% increase in engine power and 4% greater torque. In addition, traction has been booste