Skip to main content

Safer roads

The first SAB-Gate supplied by Highway Care to the UK is now in use. The Balfour Beatty Mott MacDonald (BBMM) partnership installed the SAB-Gates at two strategic locations along the M4 and M5 highways, with approval from the UK's Highways Agency. The units, which are manufactured in Italy by Snoline, are now in place in the central reservation at Emergency Crossing Points. On a number of sites, BBMM is replacing the existing central reserve steel barrier with concrete step barrier (CSB) and this will requi
February 6, 2012 Read time: 2 mins
The first SAB-Gate supplied by 1529 Highway Care to the UK is now in use. The 1530 Balfour Beatty Mott MacDonald (BBMM) partnership installed the SAB-Gates at two strategic locations along the M4 and M5 highways, with approval from the UK's Highways Agency. The units, which are manufactured in Italy by 333 Snoline, are now in place in the central reservation at Emergency Crossing Points. On a number of sites, BBMM is replacing the existing central reserve steel barrier with concrete step barrier (CSB) and this will require Emergency Crossing Points that incorporate removable sections or gates. The SAB-Gate is a modular H2 containment gate system, which is transitioned on to the CSB. It can be easily opened by one person without the use of any special tools or the removal of any fixings. The 4.3m SAB-Gate modules can be opened either by individual sections, as a whole, or part gate from hinge positions at either end.

For more information on companies in this article

Related Content

  • Texas highway project tackles congestion
    May 3, 2012
    A new highway project in Texas will tackle peak congestion A major highway job is underway in Texas at present where contractor Northgate Constructors, a joint venture between Kiewit & Zachary, is working on the huge DFW Connector Project. Northgate is using equipment from Guntert & Zimmerman, an S850, S600, and two TC1500s, on the job.
  • Doka delivers cantilevering for super-slim piers at Lahntal Bridge
    October 21, 2016
    Doka’s formwork expertise is currently in demand during the construction of one of the busiest motorway viaducts in Germany. The 400m six-lane Lahntal Bridge in Limburg dates from the early 1960s. Every day about 100,000 vehicles cross the bridge that spans the valley of the River Lahn. But traffic loads have increased sharply, so a new bridge is being built sited just a few metres west of the old viaduct. The new Lahntal viaduct will measure a massive 43.5m in width, enabling eight lanes plus hard shoul
  • Utility spec for JCB's 8018
    February 15, 2012
    A range of safety specific additions have been made to JCB's 8018 mini excavator after the company worked with leading utility contractors to develop a special industry-specific version of the machine. The largest of the three 801 minis, the 1.6tonne machine retains its digging capabilities and its powerful 14.2kW Tier III compliant motor, but the utility pack offers requested upgrades. For example, to prevent damage on site, the lower door window has been replaced by a steel panel and the rear counterweigh
  • Bitumen trade bodies lead the carbon charge
    October 18, 2024
    On either side of the Atlantic, bitumen, asphalt and paving trade bodies are pushing their members to cut more carbon associated with their paving activities. Kristina Smith reports.