Skip to main content

Safer roads

The first SAB-Gate supplied by Highway Care to the UK is now in use. The Balfour Beatty Mott MacDonald (BBMM) partnership installed the SAB-Gates at two strategic locations along the M4 and M5 highways, with approval from the UK's Highways Agency. The units, which are manufactured in Italy by Snoline, are now in place in the central reservation at Emergency Crossing Points. On a number of sites, BBMM is replacing the existing central reserve steel barrier with concrete step barrier (CSB) and this will requi
February 6, 2012 Read time: 2 mins
The first SAB-Gate supplied by 1529 Highway Care to the UK is now in use. The 1530 Balfour Beatty Mott MacDonald (BBMM) partnership installed the SAB-Gates at two strategic locations along the M4 and M5 highways, with approval from the UK's Highways Agency. The units, which are manufactured in Italy by 333 Snoline, are now in place in the central reservation at Emergency Crossing Points. On a number of sites, BBMM is replacing the existing central reserve steel barrier with concrete step barrier (CSB) and this will require Emergency Crossing Points that incorporate removable sections or gates. The SAB-Gate is a modular H2 containment gate system, which is transitioned on to the CSB. It can be easily opened by one person without the use of any special tools or the removal of any fixings. The 4.3m SAB-Gate modules can be opened either by individual sections, as a whole, or part gate from hinge positions at either end.

For more information on companies in this article

Related Content

  • Supporting the highways sector during the pandemic
    April 20, 2020
    The Highways sector Council is supporting the highways sector during the pandemic.
  • Multiple asphalt plants supply major highway construction
    July 12, 2012
    One company has produced eight asphalt plants for a major project, and others are introducing new models as Patrick Smith reports Algeria's US$11.2 billion East-West Highway development, the world's largest current highway construction project, forms part of the larger Trans-Maghreb Motorway project, and is scheduled for completion in 2010. It will run for 1,216km, ensuring the link between Annaba in the north-east and Tlemcen in the north-west, passing directly through 24 provinces and linking Algeria to T
  • Bridge lift in Orlando for interstate rebuild
    July 4, 2019
    Measuring 33.8km long and costing US$2.3 billion, Orlando’s massive I-4 Ultimate is the largest infrastructure project in the Florida Department of Transportation’s history. Divided into four phases, the project requires major bridge work to improve traffic flow through Central Florida. In all, 13 existing structures are being widened, 53 new bridges added and 74 bridges replaced. Area 2, currently under construction, runs through Orlando from Highway 50 at the northern edge to the Highway 423/I-4 interc
  • National Highways to use P-AMS from TRL
    April 29, 2022
    TRL will integrate its pavement management system P-AMS, based upon iROADS, into England’s asset management progamme, replacing HAPMS.