Skip to main content

Rules of attraction

A female Australian cattle herder has attracted unwanted attention from a peculiar angle. The woman was riding a quad bike while herding dairy cattle for milking when a koala bear started pursuing her. The woman was concerned for her safety as the animal has sharp claws and accelerated away, with the koala also speeding up in hot pursuit. Luckily the woman was able to elude her pursuer without harm to either herself, or the errant koala.
December 14, 2015 Read time: 1 min
A female Australian cattle herder has attracted unwanted attention from a peculiar angle. The woman was riding a quad bike while herding dairy cattle for milking when a koala bear started pursuing her. The woman was concerned for her safety as the animal has sharp claws and accelerated away, with the koala also speeding up in hot pursuit. Luckily the woman was able to elude her pursuer without harm to either herself, or the errant koala.

Related Content

  • ACO curbs the rain
    November 20, 2023

    ACO says its KerbDrain CycleKerb drainage solution for bike lanes in England meets LTN 1/20 standards while making travel safer for all cycle lane users.

    Local Transport Note 1/20 (LTN 1/20) sets out minimum standards for English local authorities and highway engineers when implementing new cycle infrastructure. It includes, but is not limited to, cycle crossings and junctions, cycle lanes, cycle tracks, cycle networks and cycle parking.

  • Clever approach to reducing bridge vibrations
    November 14, 2013
    Reducing vibrations on a bridge, supplying high-quality binders to emerging countries and helping small and medium players with warm mix, this month’s stories showcase some innovative bitumen technology solutions - Kristina Smith reports The Kessock Bridge in the Highlands of Scotland has become the third bridge in the UK to be resurfaced with Gussasphalt. A dense mastic asphalt containing Nynas Endura N5, a polymer modified binder, Gussasphalt has been designed to have a longer life than standard mastic as
  • Drilling rig meets the utility supply challenge
    April 11, 2012
    A tricky utility supply project has been carried out in difficult conditions in Germany, without disturbing a village access road. The drilling work for the project was operated by boring contractor Beermann and the site was located on a plateau some 5km from the nearest village.
  • Drilling rig meets the utility supply challenge
    May 9, 2012
    A tricky utility supply project has been carried out in difficult conditions in Germany, without disturbing a village access road. The drilling work for the project was operated by boring contractor Beermann and the site was located on a plateau some 5km from the nearest village.