Skip to main content

Ruggedised networking solutions

The new COPave package from LafargeHolcim offers users the chance to evaluate the long-term environmental footprint of road construction. COPave is a life cycle assessment (LCA) software specific to roads, which allows designers, authorities, lenders and contractors to evaluate the environmental footprint of roads. Users can target the best carbon optimum for road investment as a result. CoPave is a collaborative integrated service that can be used for both new road projects and refurbishment works.
September 15, 2020 Read time: 2 mins
LafargeHolcim has developed a program that allows users to determine the long-term sustainability of road construction

The package offers the answer to a number of key questions for road contractors and clients alike. What is the environmental impact of rigid, semi-rigid or flexible structures? Does soil stabilisation reduce the environmental footprint of pavement and if so, by how much? How can engineers quantify the environmental impact of recycling in road construction? And how are innovative structures, materials and solutions performing from an environmental point of view? What about the impact of materials hauling distances?

According to LafargeHolcim, the responses to these questions are often biased and based on habits, preferences, or perceptions. However, the company’s researchers have developed COPave to provide an objective and exhaustive evaluation of road projects to assist decision-making.

The firm says that COPave allows an objective evaluation of roads, covering all stages of the projects, from the choice of raw materials to end of life considerations, including the use phase of the roads.

A number of parameters need to be considered when performing the life cycle assessment of a road project. These parameters range from the choice of raw materials and the pavement structural design, to the chosen maintenance scenario and its effect on the fuel efficiency of the vehicles during the project’s use phase.

The LCA results also depend on local climate conditions and traffic forecasts that change from project to project. That is why there is no universal answer as to what the best material or structure is, and why COPave is needed to fully understand the potential impact of often complex projects.

The environmental performance of any road project also depends on the local context. Several asphalt plants and aggregate quarries are available at different distances, leading to different production processes and offering different products.

These local conditions can result in a 30% change in the carbon emissions associated with the construction and maintenance operations of the project. COPave allows users to optimise the impacts of operations while also understanding how the choices made can affect the impact of the use and end-of-life phases of the road project. Understanding which life cycle stage offers the highest carbon emissions saving potential will be key in supporting the deployment of a sustainable road infrastructure.

For more information on companies in this article

Related Content

  • Earthmoving developments for construction machines
    August 14, 2017
    Excavators, wheeled loaders and ADTs have all seen improvements for this year. New developments in earthmoving machines continue to help improve working efficiency for contractors. The excavator market is the largest single segment of the construction machine sector, with competition being tough between the major players, and a steady stream of new models coming to market. Doosan has launched the new Stage IV compliant DX225LC-5 crawler excavator, which is said to offer high performance, fuel efficiency, r
  • Widening works: road user’s nightmare or operator’s challenge?
    March 14, 2017
    Early - and continuous planning - is essential for successful road widening projects. By Nina Sacagiu, project manager, and Laurent Charles-Nicolas, project director, at Egis. Keeping goods and people moving safely is the primary objective of any transport authority across the world. Delivering this objective on motorways and making the most out of network capacity requires all the resources, skills and ingenuity of those in charge of managing the infrastructure. When the network can no longer cope wit
  • Germany builds its first major PPI autobahn project
    July 7, 2015
    Rebuilding of one of the oldest motorways in Germany is testing out the possibilities for public-private project road construction reports Adrian Greeman A freshly renovated section of the A8 Autobahn in southern Germany will be watched with some interest this summer as traffic begins driving along its rebuilt carriageway and additional third lanes. That is not because of any special road features, other than a distinctive reddish colour to its concrete surface, but because it is a first fullscale public
  • Philipp Swarovski lays down the marker
    June 10, 2019
    Swarco’s chief operating officer Philipp Swarovski shares his thoughts on highway safety and infrastructure in an age of uncertain future needs. David Arminas reports It was in Austria in 1969 when Manfred Swarovski opened his first glass bead factory. Five years later, operations started in the US. As the years rolled by there followed acquisitions and expansion of manufacturing facilities as well as a shift into intelligent transportation systems globally. Fast forward to 2019 and the family compan