Skip to main content

Quick Rescue

Quick thinking helped in the rescue of a young boy recently in the UK. A car knocked down the young child in a traffic incident but a fast response from burly passers-by saw the vehicle actually being lifted off the child. Emergency services were quickly on scene to take the injured child to hospital and although the injuries were by no means slight, he is expected to recover.
December 18, 2017 Read time: 1 min

Quick thinking helped in the rescue of a young boy recently in the UK. A car knocked down the young child in a traffic incident but a fast response from burly passers-by saw the vehicle actually being lifted off the child. Emergency services were quickly on scene to take the injured child to hospital and although the injuries were by no means slight, he is expected to recover.

Related Content

  • Safety technology to cut crashes
    January 22, 2020
    Bloomberg Philanthropies has commissioned a new road safety report that shows 42,000 lives could be saved and 150,000 serious injuries prevented by 2030.
  • Reduced traffic may not mean fewer crashes
    May 8, 2020
    Reduced traffic may not mean that there are fewer crashes on the world’s roads.
  • The era of workzone data
    July 4, 2018
    Portable work zone messaging is now integral - not an add-on - when it comes to safety on large-scale highway projects. Andrew Williams* reports. Portable work zone ITS solutions have emerged in recent years as important flexible tools for managing major roadwork projects, from new-build to upgrades. They effectively ensure traffic disruption is kept to a minimum and lives can be saved. As such, the technology forms a central component of a major €1.7 billion project in the southern English county of Cambr
  • Machine control technology shortens road contract
    May 28, 2013
    The use of sophisticated machine control technology has helped halve the schedule required for a road contract – Jeff Winke. By using the latest machine control systems on the equipment fleet, a US contractor has managed to halve worker hours, machine time and overall costs. “We chopped 50% off the contract schedule,” said Jim Swenson, licensed professional land surveyor for Oregon Mainline Paving based in McMinnville, Oregon. “The project was completed a year ahead of the two-year schedule,” he explained