Skip to main content

Premium ponds

A series of balancing ponds are being used to create a sustainable drainage solution on the Highways Agency’s £375m 28km dual carriageway extension of the A46 in Nottinghamshire. Fearing that a doubling of the surface area of the Newark to Widmerpool trunk road would create excessive high surface water runoff, principal contractor Balfour Beatty and their consultant engineers, URS Scott Wilson, designed 12 balancing ponds, with the outfall from each controlled by Hydro International’s Hydro-Brake Flow Cont
April 25, 2012 Read time: 2 mins
A series of balancing ponds are being used to create a sustainable drainage solution on the 2309 Highways Agency’s £375m 28km dual carriageway extension of the A46 in Nottinghamshire.

Fearing that a doubling of the surface area of the Newark to Widmerpool trunk road would create excessive high surface water runoff, principal contractor 1146 Balfour Beatty and their consultant engineers, URS Scott Wilson, designed 12 balancing ponds, with the outfall from each controlled by 1402 HYDRO International’s Hydro-Brake Flow Control devices.

2759 Environment Agency guidelines require flow restrictions to be held at the predevelopment rate for greenfield runoff, to channel water volumes into local watercourses and control water quality. The A46 also lies adjacent to several environmentally, agriculturally and historically sensitive locations as well as within the flood plains of the Rivers Trent and Devon.

Designed with a permanently wet sump area, the balancing ponds also feature vegetated dry sections to ensure maximum entrapment of debris and silt at most stages of inflow. The outflow of each pond is fitted with a Hydro-Brake Flow Control or chamber, depending on maximum design flow required, from 27.5 to 66 litres/sec.

Work on the A46 upgrade scheme began in 2009, and is due to be completed in summer 2012. It is expected to improve traffic flow and
safety, while by-passing several villages.

For more information on companies in this article

Related Content

  • Fast, safe and sustainable transport for Johannesburg
    April 12, 2012
    GTZ highlights a pioneering scheme illustrating the potential of Bus Rapid Transit systems as a viable approach to alleviate the traffic and social problems faced by large cities worldwide Most major cities worldwide have been characterised by the phenomenon of steadily growing urbanisation accompanied by exponentially increasing numbers of private motorised vehicles. This has led to congested roads and sprawling cities, with commuters having to travel long distances to and from work. Despite huge inves
  • A new additive for self-de-icing asphalt mixture roads in winter
    December 14, 2020
    A new additive from Iterchimica aims to help minimise icing on asphalt surfaces in winter conditions
  • £8 billion UK tunnel project to go ahead
    January 30, 2025
    The £8 billion UK Lower Thames Crossing tunnel project is to go ahead.
  • Stonehenge tunnel project being designed
    April 12, 2017
    Consultant AECOM is now working with Highways England on improvements to the busy A303 in the UK. The road upgrades will be carried out between Amesbury and Berwick South Down along a 13km section of the A303 route. AECOM will work with its supply chain partners Mace and Mouchel on the project. As the current alignment for the A303 passes just 165m from the Stonehenge World Heritage site (WHS), there is a strong need to redevelop the route so that it causes less harm to this important archaeological area. T