Skip to main content

Premium ponds

A series of balancing ponds are being used to create a sustainable drainage solution on the Highways Agency’s £375m 28km dual carriageway extension of the A46 in Nottinghamshire. Fearing that a doubling of the surface area of the Newark to Widmerpool trunk road would create excessive high surface water runoff, principal contractor Balfour Beatty and their consultant engineers, URS Scott Wilson, designed 12 balancing ponds, with the outfall from each controlled by Hydro International’s Hydro-Brake Flow Cont
April 25, 2012 Read time: 2 mins
A series of balancing ponds are being used to create a sustainable drainage solution on the 2309 Highways Agency’s £375m 28km dual carriageway extension of the A46 in Nottinghamshire.

Fearing that a doubling of the surface area of the Newark to Widmerpool trunk road would create excessive high surface water runoff, principal contractor 1146 Balfour Beatty and their consultant engineers, URS Scott Wilson, designed 12 balancing ponds, with the outfall from each controlled by 1402 HYDRO International’s Hydro-Brake Flow Control devices.

2759 Environment Agency guidelines require flow restrictions to be held at the predevelopment rate for greenfield runoff, to channel water volumes into local watercourses and control water quality. The A46 also lies adjacent to several environmentally, agriculturally and historically sensitive locations as well as within the flood plains of the Rivers Trent and Devon.

Designed with a permanently wet sump area, the balancing ponds also feature vegetated dry sections to ensure maximum entrapment of debris and silt at most stages of inflow. The outflow of each pond is fitted with a Hydro-Brake Flow Control or chamber, depending on maximum design flow required, from 27.5 to 66 litres/sec.

Work on the A46 upgrade scheme began in 2009, and is due to be completed in summer 2012. It is expected to improve traffic flow and
safety, while by-passing several villages.

For more information on companies in this article

Related Content

  • Advances in rubber tyre machine market
    February 19, 2013
    One market segment where there have been notable developments has been for rubber tyred asphalt rollers. Several models have been introduced, and the Chinese market has played a key role in this respect, with both international and indigenous companies introducing machines. BOMAG’s Chinese factory is not simply building models developed in Europe. This recently expanded facility has its own research and development teams and is developing machines for China, and also for the international market. Emission r
  • Australian road maintenance needs an immediate $3.78 billion boost
    July 4, 2014
    The Australian National Road and Motorists Association (NRMA) has published a report highlighting a widening gap in national funds available for road maintenance, a gap which the motoring group says has already reached Aus $3.78 billion. The association is calling on the Federal Government to allocate more fuel excise revenue to road projects, saying up to half of the current 38.1 cents per litre is required to fund the ‘black hole’.
  • Bridge formwork solutions complete big bridge picture
    July 2, 2014
    Advanced bridge formwork solutions are allowing contractors to complete vital major highway infrastructure projects covering Norway, Sweden, Estonia and Poland. Guy Woodford reports Building the Labbdalen bridges in Norway is a key feature of the E6 highway improvement programme. Main project contractor HÆHRE tasked RMD Kwikform and Teknikk with supplying a complete formwork and shoring solution that could tackle the challenging Norwegian terrain, whilst preserving the environment. Situated two hours
  • UK highway maintenance contract award
    October 5, 2018
    A major UK highway maintenance contract has been won by Balfour Beatty. The seven year deal is worth £103 million and was awarded by Telford and Wrekin Council for the maintenance of highways assets. The package also comes with an option to extend the contract for a further seven years. Balfour Beatty Living Places will work with the Council to maintain the Borough’s 1,002km of highways and 1,189km of footpaths, provide drainage cleansing services as well as winter gritting and reactive highways maintena