Skip to main content

Precision measurements

Nikon-Trimble is now offering the new Nikon 25mm and 127mm Total Stations, which are said to deliver improved accuracy over previous products.
February 7, 2012 Read time: 2 mins
RSS2375 Nikon-Trimble is now offering the new Nikon 25mm and 127mm Total Stations, which are said to deliver improved accuracy over previous products. The new Nikon Nivo 1.C is a high accuracy, reflectorless mechanical total station, while the Nikon DTM-322 is a high value, prism-based 127mm dual-faced total station. Each new model offers high quality optics, performance and reliability and can be used for a variety of surveying applications.

The Nivo 1.C total station complements the existing Nivo C Series surveying solutions and reflects the dependability and reliability represented by the Nikon name. Enabling users to see 12.7mm angular displays, this instrument is said to provide robust locking tangents to ensure quality data. The Nivo Series can provide surveyors with valuable positioning tools to conduct topographic data collection, stakeout or layout jobs, cadastral boundary surveys and more.

Features include a Windows CE touchscreen interface, while field application software functions are provided by the 2373 Spectra Precision Survey Pro package for surveying and construction measurement needs. The Nikon total stations provide a long-distance reflectorless measurement range of up to 300m, reducing the need for multiple set-ups. In addition, the Nikon Nivo Series includes a coaxial laser pointer to assist with target identification and reducing aiming time. All Nivo C Series feature a dual-face display, high-precision angle and distance measurements, cable-free Bluetooth connections to external data collectors, support for USB memory sticks, and a high-speed data transfer port. Rugged and durable, the units can operate in virtually all types of weather. Each product supports two interchangeable, onboard batteries that provide up to 62 hours of continuous angle measurements.

For more information on companies in this article

Related Content

  • Formwork plays a leading role in global infrastructure projects
    June 13, 2012
    New and highly regarded existing formwork systems have been used in major recent transport-related construction projects across the globe. Guy Woodford looks at some of their applications The multi-million dollar Mississippi River Bridge project in the United State is creating a vital new gateway between Illinois and Missouri. Central to the project is the realignment and reconstruction of Interstate 70 and a new landmark bridge, featuring two pylons projecting vertically from the Mississippi river bed w
  • Trends in compaction machine technology
    February 20, 2012
    More efficient and productive compaction solutions are coming to market shortly, Mike Woof reports. Several key trends are emerging in the asphalt compaction market with the development of the latest generation machines. Performance and productivity remain key issues for compactor manufacturers with firms keen to maximise output from their latest units.
  • The concrete option
    July 31, 2012
    Concrete highway construction techniques and technology continues to evolve. Mike Woof reports The recent increases in oil costs are having a knock-on effect for the road construction sector, as asphalt prices have increased noticeably and faster than those for concrete. This has spurred renewed discussion over which construction technique now offers the best long term solution for road building. The debate between those in favour of concrete and those preferring asphalt for highway construction has been on
  • Bridge inspection: destructive versus non-destructive methods
    January 6, 2015
    Tens of thousands of bridges in the United States are in desperate need of repair. But where to begin analysing their deteriorating state? Roger Roberts* investigates tips and techniques for ensuring bridge safety The average age of America’s more than 600,000 crumbling bridges is 42 years – many are 60 to 80 years old. The situation is dire, with many described as functionally obsolete, according to the American Society of Civil Engineers’ latest edition of its Report Card for America’s Infrastructure.