Skip to main content

Pothole and marking options

Ennis Prismo Traffic Safety Solutions now has a quick solution to pothole patching problems and temporary road marking needs.
February 21, 2012 Read time: 2 mins
1394 Ennis Prismo Traffic Safety Solutions now has a quick solution to pothole patching problems and temporary road marking needs. The firm's Repair product is said to be easy to use, providing a fast and long-life solution for repairing potholes of any size, shape and depth, in both asphalt and concrete surfaces. This cold-asphalt reinstatement material can be used in varying weather conditions and can carry traffic immediately after installation. Meanwhile the Multi-use Repair variant is suitable for restoring any surface stripping, infilling cable ducts and trenches, or as a joint filler. It can also be used to form speed bumps, or as a full surface overlay and because it adheres well to metal, to re-instate around manhole covers. The Repair product is designed to provide a long-term surface reinstatement and to prevent further deterioration of the surface. It contains five specialis additives, quality penetration-grade bitumen and special selected aggregates.

To meet international specifications, the product is manufactured in a controlled environment, with extremely strict levels of quality control.

In addition the firm's latest temporary road marking system is said to be quick to install and offer higher levels of durability than previous products. Previous temporary road marking solutions have associated problems such as a lengthy drying or curing process, a need for high installation temperatures and a requirement for large machinery. But the novel pre-formed, cold applied road paint, marketed under the Paintmark brand from Ennis Prismo offers an innovative solution. This product is said to be simple and quick to use and can minimise costly road closure times. This can carry traffic immediately after installation and can also be removed easily. The product can be produced in a wide selection of shapes, lines, colours and designs, including symbols and company logos and is workable even at low temperatures. The special paint comprises a durable waterborne traffic paint, into which high index glass beads can be incorporated to provide high retro-reflectivity if required. The system bonds to the road surface using a natural bitumen with high adhesive qualities. Between the paint and the adhesive is a layer of specially developed high strength fabric, which binds the two together. Removal is achieved by simply warming the product with a gas torch or steam hose and there is no need for hydroblasting, scabbling, or the use of a heat lance.

For more information on companies in this article

Related Content

  • Work on St Petersburg bridge project
    June 20, 2016
    Contractor ICA Construction used two Aquajet robotic hydrodemolition machines at the top of a 120m-high bridge pylon located in the city of St Petersburg. The two Aquajet robotic water cutters were used to remove surplus concrete from around the inner steel structure of the bridge pylon. This link spans the River Neva and forms part of the Western High-Speed Diameter (WHSD) route in St Petersburg. The WHSD is a highly important route for the region and will provide a key connection between the Scandinavi
  • Runway rebuild with Caterpillar machines
    February 2, 2017
    Kilgore Contracting has used Caterpillar machines to repave a runway at the Provo Utah Municipal Airport.
  • Benninghoven | Sustainability in asphalt production
    October 27, 2022
    Working more efficiently with sustainable and economical technologies is the challenge of today and tomorrow. Solutions from Benninghoven lower emissions and secure the future of asphalt mixing plant sites.
  • Swiss roundabout goes underground
    February 7, 2012
    The Swiss, well-known for their tunnel constructions, have enhanced their reputation with the recent Gotthard Tunnel breakthrough which has created the world's longest tunnel. And in Bern, a roundabout is being re-positioned almost 10m under the ground, which will transform a somewhat dismal road intersection into an attractive gateway to the country's capital. PERI provided a comprehensive formwork solution for the realisation of the massive beams, reinforced concrete slab along with the conically-sh