Skip to main content

Pothole and marking options

Ennis Prismo Traffic Safety Solutions now has a quick solution to pothole patching problems and temporary road marking needs.
February 21, 2012 Read time: 2 mins
1394 Ennis Prismo Traffic Safety Solutions now has a quick solution to pothole patching problems and temporary road marking needs. The firm's Repair product is said to be easy to use, providing a fast and long-life solution for repairing potholes of any size, shape and depth, in both asphalt and concrete surfaces. This cold-asphalt reinstatement material can be used in varying weather conditions and can carry traffic immediately after installation. Meanwhile the Multi-use Repair variant is suitable for restoring any surface stripping, infilling cable ducts and trenches, or as a joint filler. It can also be used to form speed bumps, or as a full surface overlay and because it adheres well to metal, to re-instate around manhole covers. The Repair product is designed to provide a long-term surface reinstatement and to prevent further deterioration of the surface. It contains five specialis additives, quality penetration-grade bitumen and special selected aggregates.

To meet international specifications, the product is manufactured in a controlled environment, with extremely strict levels of quality control.

In addition the firm's latest temporary road marking system is said to be quick to install and offer higher levels of durability than previous products. Previous temporary road marking solutions have associated problems such as a lengthy drying or curing process, a need for high installation temperatures and a requirement for large machinery. But the novel pre-formed, cold applied road paint, marketed under the Paintmark brand from Ennis Prismo offers an innovative solution. This product is said to be simple and quick to use and can minimise costly road closure times. This can carry traffic immediately after installation and can also be removed easily. The product can be produced in a wide selection of shapes, lines, colours and designs, including symbols and company logos and is workable even at low temperatures. The special paint comprises a durable waterborne traffic paint, into which high index glass beads can be incorporated to provide high retro-reflectivity if required. The system bonds to the road surface using a natural bitumen with high adhesive qualities. Between the paint and the adhesive is a layer of specially developed high strength fabric, which binds the two together. Removal is achieved by simply warming the product with a gas torch or steam hose and there is no need for hydroblasting, scabbling, or the use of a heat lance.

For more information on companies in this article

Related Content

  • Dowel bar drilling selection poses challenges
    January 11, 2013
    Pneumatic concrete dowel drills have one purpose – to drill holes. While their intended use is easy to recognize, operation of this equipment isn’t quite so simple. In fact, it’s a bit of a science. That’s not to say they’re difficult to operate. But there are certain best practices and processes to keep in mind for proper drill operation, whether it’s an on-grade, slab-rider or equipment-mounted model. Operators who adopt these guidelines and implement them on every job are rewarded with better performance
  • Simex launches MP 1000HD for tunnel profiling
    March 5, 2024
    Designed for excavators from 35-60 tonnes that are customised for tunneling, the HD version differs from the original MP model of the same width in several ways.
  • Cortec provides MCI 2020 protection for Croatia’s Krk Bridge
    February 5, 2020
    Krk Bridge is a 1.4km reinforced concrete arch bridge connecting the Croatian island of Krk to the mainland and carrying over a million vehicles per year. The longer of the bridge's two arches is the longest concrete arch in the world outside of China.
  • Germany builds its first major PPI autobahn project
    July 7, 2015
    Rebuilding of one of the oldest motorways in Germany is testing out the possibilities for public-private project road construction reports Adrian Greeman A freshly renovated section of the A8 Autobahn in southern Germany will be watched with some interest this summer as traffic begins driving along its rebuilt carriageway and additional third lanes. That is not because of any special road features, other than a distinctive reddish colour to its concrete surface, but because it is a first fullscale public