Skip to main content

Portuguese palaeontologists protest

A Portuguese construction contractor has caused dismay amongst archeologists after he dug up some dinosaur bones. The man put the sauropod tail bones, which measure a total 3.6m long, for sale on the Internet causing a flurry of protest from Portuguese palaeontologists. The valuable bones are thought to be from 146-152 million years old. However, the contractor has so far refused an offer of €100,000 from a Portuguese museum and is also refusing to tell palaeontologists where the find was made.
July 6, 2012 Read time: 1 min
A Portuguese construction contractor has caused dismay amongst archeologists after he dug up some dinosaur bones. The man put the sauropod tail bones, which measure a total 3.6m long, for sale on the Internet causing a flurry of protest from Portuguese palaeontologists. The valuable bones are thought to be from 146-152 million years old. However, the contractor has so far refused an offer of €100,000 from a Portuguese museum and is also refusing to tell palaeontologists where the find was made.

Related Content

  • A macro website launched for microsurfacing processes
    October 9, 2018
    RoadResource.org as a go-to website for surfacing information is now live When RoadResouce.org went live – quietly - in July it was the end of two years of hard work by three major US associations for pavement preservation. But there was no grand party or ceremonial pushing of the “go live” button, says Doug Hogue, vice president and general manager of VSS Macropaver. “For all of us in the industry July is a busy period that left little time to celebrate on the opening day,” says the 51-year-old chartere
  • Looking ahead for Power Curbers
    September 26, 2023
    Power Curbers president Stephen Bullock discussed business trends with Mike Woof
  • US pedestrian deaths are a cause for concern
    March 3, 2020
    The increase in US pedestrian deaths is a cause for concern
  • St Petersburg link may include tunnel
    September 28, 2017
    A new alignment is being considered for a major project in Russia’s second city, St Petersburg. A tunnel stretch running under the Neva River is being considered as an alternative route for the Eastern High Speed Diameter (EHSD) project. This tunnel would take the place of the fixed bridge, which has been criticised by some for its impact on the city’s skyline. However building the tunnel would increase the cost of the project by around US$52 million.