Skip to main content

New powder coating plane for Doka

Doka, an Austrian formwork solutions company, has commissioned a new powder-coating plant in St. Martin, close to the company’s corporate headquarters in Amstetten
October 12, 2021 Read time: 2 mins
Automatic, digital and flexible: Doka’s new powder-coating plant selects the right powder application method, such as the robot hand, to suit a client’s needs (image courtesy Doka)

The highly-automated plant “forms part of a multistage expansion of production facilities in St. Martin with a total investment volume of €40 million”.

Doka said the new powder-coating plant consumes 80% less water than the previous plant and uses environmentally friendly chemicals. The use of sophisticated technologies also permits the plant to save energy in the operation of the furnaces.

"The plant design was inspired by the notion of maximum flexibility," said Christian Mayr, Doka’s vice president of production. A major new feature is that even the larger components of the Doka Framax product range can be powder-coated in the near future. This also means that small series, in addition to large-scale series, can now be produced quickly and economically. The new powder-coating plant adds a real touch of colour, with frame elements able to be painted according to client wishes, such as in corporate colours.

Doka’s new chief executive, Robert Hauser: more digitalisation (image courtesy Doka)
Doka’s new chief executive, Robert Hauser: more digitalisation (image courtesy Doka)

Due to the high level of automation and digitisation in the production process, the range can even be produced in Austria at competitive prices. The plant is currently being ramped up to run as a single-shift operation. The company also plans to make the plant available for contract manufacturing in the future.

The commissioning coincides with Robert Hauser taking over as chairman of the company. Hauser joined the company in 2018 and has been a board member for the Middle East & Africa and East Asia & Pacific regions since last year. He moved from Dubai for the new position and takes over from Harald Ziebula who is retiring from Doka after 21 years. He intends to accelerate Doka’s digitalisation in the sense of intelligent methods and efficient processes.

Prior to joining Doka, Hauser was employed by the industrial services provider Bilfinger SE where his responsibilities included the Scaffolding division. Before Belfinger, he worked at scaffolding provider Peri for 12 years.  

For more information on companies in this article

Related Content

  • Metso expand NW Rapid crusher line-up
    November 28, 2018
    Metso is introducing new higher capacity models to its popular wheel-mounted Metso NW Rapid series. In addition to the bigger jaw crusher model, the NW Rapid units are now also available with a variety of most robust cone crushers, including the first model with the MX crusher. Easily transportable using standard prime movers, over 1,000 NW Rapid models have already been sold. Planning a crushing and screening process can typically take months. Additionally, it's often difficult for aggregates producers
  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.
  • Bridge engineering worldwide
    July 1, 2013
    Guy Woodford looks at vital bridge construction, repair and inspection projects in China, Europe, North America and Australia The Heron Road Bridge in Ottawa, Ontario in Canada is a vital link within the City’s transport network, as it crosses the Rideau River, which divides the east and west parts of the City. Constructed in 1966-1967, the Heron Road Bridge is approximately 275m long and includes six lanes.
  • SBM concrete plants for Fehmarnbelt tunnel
    June 17, 2021
    The 18km Fehmarnbelt Fixed Link in the Baltic Sea will create an uninterrupted traffic link between the Danish island of Lolland and the German Island of Fehmarn.