Skip to main content

New powder coating plane for Doka

Doka, an Austrian formwork solutions company, has commissioned a new powder-coating plant in St. Martin, close to the company’s corporate headquarters in Amstetten
October 12, 2021 Read time: 2 mins
Automatic, digital and flexible: Doka’s new powder-coating plant selects the right powder application method, such as the robot hand, to suit a client’s needs (image courtesy Doka)

The highly-automated plant “forms part of a multistage expansion of production facilities in St. Martin with a total investment volume of €40 million”.

Doka said the new powder-coating plant consumes 80% less water than the previous plant and uses environmentally friendly chemicals. The use of sophisticated technologies also permits the plant to save energy in the operation of the furnaces.

"The plant design was inspired by the notion of maximum flexibility," said Christian Mayr, Doka’s vice president of production. A major new feature is that even the larger components of the Doka Framax product range can be powder-coated in the near future. This also means that small series, in addition to large-scale series, can now be produced quickly and economically. The new powder-coating plant adds a real touch of colour, with frame elements able to be painted according to client wishes, such as in corporate colours.

Doka’s new chief executive, Robert Hauser: more digitalisation (image courtesy Doka)
Doka’s new chief executive, Robert Hauser: more digitalisation (image courtesy Doka)

Due to the high level of automation and digitisation in the production process, the range can even be produced in Austria at competitive prices. The plant is currently being ramped up to run as a single-shift operation. The company also plans to make the plant available for contract manufacturing in the future.

The commissioning coincides with Robert Hauser taking over as chairman of the company. Hauser joined the company in 2018 and has been a board member for the Middle East & Africa and East Asia & Pacific regions since last year. He moved from Dubai for the new position and takes over from Harald Ziebula who is retiring from Doka after 21 years. He intends to accelerate Doka’s digitalisation in the sense of intelligent methods and efficient processes.

Prior to joining Doka, Hauser was employed by the industrial services provider Bilfinger SE where his responsibilities included the Scaffolding division. Before Belfinger, he worked at scaffolding provider Peri for 12 years.  

For more information on companies in this article

Related Content

  • UK construction machine sales see drop
    October 29, 2020
    UK construction machine sales have seen a drop for 2020 compared with 2019.
  • New Ammann Plate Compactors are the fastest on the market
    January 22, 2025
    LANGENTHAL, Switzerland – New Ammann Reversible Vibratory Plate Compactors bring improved value to the jobsite, including speed that surpasses competitive models and an ability to climb grades as steep as 30 %.
  • Right ways to deter wrong-way
    November 11, 2020
    After a pilot programme, California’s Caltrans is reviewing its highway design standards
  • Safe and efficient urban mobility for Africa
    May 17, 2023
    Transitioning to zero-carbon transport globally is essential to keep climate change in check. Yet seven years after the Paris Climate Agreement, transport emissions are still rising. In a new op-ed, Nina Elter argues that a radical shift in our approach to transportation sustainability is required. Every year, governments around the world invest more than US$700 billion in road infrastructure. While these investments yield significant economic and social returns, transport continues to generate large costs on societies, in the form of harmful emissions, traffic injuries and lost time due to congestion.